Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Mylyn/Incubator/Generic Industrial Connector"

(Screenshot)
(Screenshots)
Line 56: Line 56:
  
 
==Screenshots==
 
==Screenshots==
[[Image:Mylyn_sql_1.png]]
+
[[Image:Mylyn_sql_1.png|thumb|none|200px|From the Thames]]
 
+
[[Image:Dbconfig.png|thumb|none|200px|From the Thames]]
[[Image:Dbconfig.png]]
+

Revision as of 10:31, 18 March 2008

This is a temp doc space for the generic SQL connector for mylyn.

Temporary SVN

svn://bugs.industrial-tsi.com/mylyn_gsc

Members

Maarten Meijer
Wim Jongman

Plan

bug 184532

Current work is done using Apache Ibatis so that all configuration can be stored in the ibatis xml configuration files.

Legal parameter sets for various fields can then be stored as pseudo queries.

Generic Task Structure to map to any SQL DB

These are mainly the fields from AbstractTask

- repositoryUrl
- taskId
- owner
- summary
- priority (as P1, P2, P3, P4 or P5)
- completed
- completionDate (null is not completed)
- creationDate
- dueDate
- notes

Further more a generic Task can hold:

- a list of TaskComments and
- a list of TaskAttachments.

But how?

Generic Query Structure to map to any SQL DB

There will be a Query window allowing (full text) selection on:

- taskId : match a specific ID
- owner : match a known owner from a list
- summary : match a string in a description
- priority (as P1, P2, P3, P4 or P5) : match one or more priorities
- completed : match true or false
- completionDate (null is not completed)  : match before, after and null
- creationDate  : match before, after and null
- dueDate  : match before, after and null
- notes : match a string in a description

and possibly:

- in the list of TaskComments and
- in the list of TaskAttachments.


Screenshots

From the Thames
From the Thames

Back to the top