| align="left" | Studying the documentation and existing code and prepare toolchain  
 
| align="left" | Studying the documentation and existing code and prepare toolchain  
 
| In Progress  
 
| In Progress  
| [https://bugs.eclipse.org/bugs/show_bug.cgi?id=169788 BUG 196788] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=187698 BUG 187698] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=197924 BUG 197924] <br>
+
| [https://bugs.eclipse.org/bugs/show_bug.cgi?id=169788 BUG 196788] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=187698 BUG 187698] <br> [https://bugs.eclipse.org/bugs/show_bug.cgi?id=197924 BUG 197924] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=198004 BUG 198004] <br> [https://bugs.eclipse.org/bugs/show_bug.cgi?id=336298BUG 336298] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=340794BUG 340794] <br> [https://bugs.eclipse.org/bugs/show_bug.cgi?id=355973BUG 355973] [https://bugs.eclipse.org/bugs/show_bug.cgi?id=355015BUG 355015]<br>
 
|- style="background: lightgrey none repeat scroll 0% 0%; -moz-background-clip: border; -moz-background-origin: padding; -moz-background-inline-policy: continuous;"
 
|- style="background: lightgrey none repeat scroll 0% 0%; -moz-background-clip: border; -moz-background-origin: padding; -moz-background-inline-policy: continuous;"
 
! M2  
 
! M2  

Revision as of 13:48, 25 April 2012

This is the wiki page for the GSOC2012 project Activity Tracing for Mylyn.

Student: Timur Achmetow
Mentor: Steffen Pingel
Bug ID: BUG 376233 / BUG 355974

About

The Mylyn task editor is the hub for task-focused collaboration. Yet, there are many other artifacts and activities that are part of the development workflow that are visualized in different views in the IDE. A unified activity view that aggregates tasks, builds, reviews and commits either in a dashboard or embedded in the task editor would nicely enhance traceability and visibility.

This additional data could show for example in the task editor or in a dashboard (new view). The new view helps the user to trace the selected tasks. One use case for this view could be, show the files, which are changed with the last commit. So the user have later the possibility to see, which files with this task are changed. Similar use cases are the build and review traces, who the user want see, if the selected task have an association with the build server task or a finished review task. So can die developer see, which changes have broken the build. With these additional data the task editor gets more connection to other developer tools.

Details

Implementation steps:

  1. Show the commit informations in a TableViewer, which is embedded in the task editor.
  2. Extend the Tableviewer for the additional build and review data. The TableViewer displays now all needed data.
  3. Embed the additional data in the comment stream (task editor).
  4. Optional: Dashboard, which aggregates data about several tasks.

Mookup

Mookup.png

Architecture

Milestones

Milestone Date Items Status Bugzilla Entry
M1 May 01, 2012 Studying the documentation and existing code and prepare toolchain In Progress BUG 196788 BUG 187698
BUG 197924 BUG 198004
336298 340794
355973 355015
M2 May 20, 2012 Create a design and mockup In Progress N/A
M3 July 15, 2012 Mid term: Show commit information in task editor TBD N/A
M4 July 30, 2012 Show builds and code reviews in the task editor TBD N/A
M5 August 13, 2012 Embed activity data in the comment stream TBD N/A
M6 August 20, 2012 Pencils down: Documentation complete TBD N/A