Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Milestone 1.0M9"

(Architecture)
(Components)
Line 25: Line 25:
 
* ISS
 
* ISS
 
* Token Service [[TS ToDo]]
 
* Token Service [[TS ToDo]]
* IdAS: [[IdAS ToDo]]
+
* IdAS: [https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&product=Higgins&component=IdAS&target_milestone=0.9&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0= IdAS 0.9 tasks]
 
* IdAS JNDI CP
 
* IdAS JNDI CP
 
* IdAS Jena CP
 
* IdAS Jena CP

Revision as of 21:24, 24 July 2007

  • Original Date June 15
  • Revised Date July 27th

Focus is on architectural adjustments, builds and clean-up prior to final packaging, API review, testing, cleanup, etc.

Cross Cutting Concerns

Architecture

The expectation is that M0.9 represents finalized architecture for 1.0. (i.e. there will be no new component-level interfaces, etc.)

  • IdAS Registry - finalize design
  • CardStoreStrategy - finalize design

Deployments

  • H3 issues (we're trying to get as many as possible of these done for the June Catalyst demo)
    1. Can import MSFT CardSpace format personal cards (.crds files)
    2. Need a user friendly way of importing a .crd file --e.g. double click on .crd file
    3. Requires installation of tomcat (unacceptable complexity)
    4. Total size too large at approx 50+ MB

Components

Each Component owner should add a link to the M0.9 "to do list" for their component:

  • HBX
  • I-Card Manager
  • RPPS Web app
  • RPPS Core
  • ISS
  • Token Service TS ToDo
  • IdAS: IdAS 0.9 tasks
  • IdAS JNDI CP
  • IdAS Jena CP

Links

Back to the top