Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "MemoryAnalyzer/Ramp Down Plan"

m (See Also)
m (See Also)
(One intermediate revision by the same user not shown)
Line 18: Line 18:
 
* [[Helios Simultaneous Release]]
 
* [[Helios Simultaneous Release]]
 
* [[Indigo Simultaneous Release]]
 
* [[Indigo Simultaneous Release]]
* [[Juno Simultaneous Release]]
+
* [[Juno/Simultaneous Release Plan]]
* [[Kepler Simultaneous Release]]
+
* [[Kepler/Simultaneous Release Plan]]
  
 
[[Category:Memory Analyzer]]
 
[[Category:Memory Analyzer]]

Revision as of 11:59, 5 June 2013

Ramp down plan

Typically the last week of a Milestone is for testing, and fixing only regressions and P1 or blocking defects. For milestones, the component lead (or delegate) is enough to review and approve a bug.

For M7, we plan to be API and feature complete, so there will be no breaking API changes and no new feature requests will be accepted.

For RC1 - RC2 only bugfixes to Memory Analyzer functionality should be done. The following describes the types of bugs that would be appropriate:

  • A regression
  • A P1 or P2 bug, one that is blocking or critical
  • Minor documentation changes

For RC3 - RC4 only bugfixes damaging the build/functionality of the simultaneous release should are allowed