Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "ICE February 2017 Status Meetings"
Line 19: | Line 19: | ||
Greg - Removing old builds from HIPP server. <br> | Greg - Removing old builds from HIPP server. <br> | ||
Anara - Install Eclipse for EMF. Working on EMF tutorial.<br> | Anara - Install Eclipse for EMF. Working on EMF tutorial.<br> | ||
+ | |||
+ | === 20170208 === | ||
+ | |||
+ | Anara - Working on EMF tutorial. <br> |
Revision as of 15:07, 8 February 2017
Contents
20170201
Greg - Training and CADES website. Working on paper.
Robert - Getting TASQC building on Linux. Getting familiar with Gnuradio
Anara - Going through tutorial and finding bugs. Reading up on Eclipse Modeling Framework.
20170203
Hilda - Working on login module of geoscience application. Working on presentation.
20170206
Hilda - Studying Spack and docker. Setting up Ubuntu machine on CADES for Docker testing. Working on planning for Eclipse Converge talk.
Robert - Looking at ADIOS Java SWIG bindings. Refactoring visualization prefrences page with Master/Details block.
Anara - Working on app store realization. Studying EMF and SWT.
20170207
Greg - Removing old builds from HIPP server.
Anara - Install Eclipse for EMF. Working on EMF tutorial.
20170208
Anara - Working on EMF tutorial.