Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Equinox/Meeting Minutes/20100622"

(New page: = Attendees = * Tom * DJ * John = Agenda = * Calls * Jeff to give a webinar on Equinox and EclipseRT. * Retrospective, schedule one for Equinox on the call for July 6th. * R4.3 specific...)
 
(Attendees)
 
Line 4: Line 4:
 
* DJ
 
* DJ
 
* John
 
* John
 +
* Jeff
  
 
= Agenda =
 
= Agenda =

Latest revision as of 14:01, 22 June 2010

Attendees

  • Tom
  • DJ
  • John
  • Jeff

Agenda

  • Calls
  • Jeff to give a webinar on Equinox and EclipseRT.
  • Retrospective, schedule one for Equinox on the call for July 6th.
  • R4.3 specification implementation in branch.

Minutes

Calls

  • We decided to stagger the equinox/p2 calls every other week.
  • Tom to change equinox google calendar and send note.
  • p2 every two weeks starting June 28th
  • equinox every two weeks starting June 22nd.

Webinar

  • Jeff is asking for diagrams and bullet points

Retrospective

  • Equinox retrospective for July 6th
  • Equinox planning council has scheduled a retrospective for July 7th

Planning

  • Framework R4.3 branch has not been merged
    • waiting for some spec work to settle before merging new API

Back to the top