Line 51: | Line 51: | ||
** 2.5.0 M9 complete | ** 2.5.0 M9 complete | ||
** 2.4.1 RC1 complete | ** 2.4.1 RC1 complete | ||
+ | * 2.5.0 Closedown | ||
+ | ** need to discuss plan | ||
+ | *** Will need final build of JPA (javax.persistence) numbered 2.1.0. | ||
+ | **** Makes no sense until codefreeze. However, what about potential bugfixes to EclipseLink? | ||
* EclipseLink to Maven Central | * EclipseLink to Maven Central | ||
** Aligned Old repo metadata and processes to new OSS standards | ** Aligned Old repo metadata and processes to new OSS standards |
Revision as of 10:10, 21 March 2013
Dial In Info:
- please contact Peter Krogh for dial in information.
The EclipseLink committers have a regular meeting (currently weekly) to discuss ongoing development issues and projects. All interested parties are welcome to attend. If you have any additional items you wished discussed please add them at the bottom of the agenda including a brief description and any relevant links. Alternatively development issues can be discussed on the EclipseLink Dev mailing list.
* When adding agenda items please send an email to the eclipselink-dev@eclipse.org list notifying attendees. This will ensure attendees are aware of agenda items prior to the meeting.
Call Schedule
The calendar is available in the following formats:
iCal,ATOM News Feed,HTML
Agenda Feb 14, 2013
Ad Hoc
Release Planning
- 2.3.4 - No Planned release
- No Plan
- 2.4.2 - GA April
- M5 - Feb 6 (Complete)
- RC1 - Mar 15 (Complete)
- 2.5.0 - GA Mid 2013 (from M4 on - Milestones 3rd Wednesday of Month)
- Peter to Schedule release review
- M8 - Feb 27 (Complete) (need to retro-promote to SonatypeOSS)
- M9 - Mar 12 (Complete)
- M10 - Apr 17
- Kepler - June 2013 (Milestone dates are when contibution is due)
- M5+1 - Feb 4 (2.5.0 M4)
- M6+1 - Mar 18 (2.5.0 M9)
Build
March 21, 2013:
- Milestone Releases
- 2.5.0 M9 complete
- 2.4.1 RC1 complete
- 2.5.0 Closedown
- need to discuss plan
- Will need final build of JPA (javax.persistence) numbered 2.1.0.
- Makes no sense until codefreeze. However, what about potential bugfixes to EclipseLink?
- Will need final build of JPA (javax.persistence) numbered 2.1.0.
- need to discuss plan
- EclipseLink to Maven Central
- Aligned Old repo metadata and processes to new OSS standards
- Snapshots and Milestone process working with Sonatype OSS
- OSS is currently experiencing (this AM) some kind of datacenter issue. servers appear down.
- 2.3 Build rework.
- Nightly process functional
- Preparing for an initial milestone promotion (waiting for clean build timeout issues and OSS)
- JPA 21 testing - no progress
- JPA Test needs to be refactored
- Server testing should be split away
- rework roughly 70% complete
- JPA21 functional. Ongoing refactoring proceeding.
- JPA Test needs to be refactored
- Issues targeted for investigation post JPA21 test working.
- Select Bundle not working with OpenJDK
- JPA-RS testing not running at Eclipse
QA
Feb 14-21 , 2013:
- EclipseLink Nightly Results (Updated on 2013-02-21)
- master - 5 failures with JPA proxyauthentication test suite on jpa2.1 - investigating; 4 new failures with DBWS utils testing on JBoss-5 (both eap and community) - investigating; all tests on Glassfish-4 failed due to it's installation directory name changed - will be fixed by QA in the next build. (the last build is 2013-02-20)
- 2.4.2 - 2 new failures with jpa no-weave testing - seems to be intermittent, need to be verified; one new failure with DBWS testing - investigating; 2 new failures with jpa on postgrsql-9 - investigating; all tests on Glassfish-4 - same as master. (the last build is 2013-02-20)
- 2.3.4 - no new build (the last build is 2012-11-25)
- Testing
- DB2 10.1 test failures - triage completed -- DB user setup issue
- Verifying that jpa2.1 issue for advanced model is resolved with latest GlassFish 4 nightly build -- found an issue in ConverterTestSuite - bug will be filed
- DBWS server test - LegacySimpleTableServiceTestSuite failed on non-WLS application servers - bug 399148 - found the cause & solution, but still failing on JBoss - investigating.
- EL 2.4.2 DB certification on Win64
- Cache co-ordination testing on WLS cluster - DHCP, win64 and Linux
- Test Dev
- 5 more JPA 2.1 test suites added to run against GF4
- misc: helped developer run DBWS tests on JBoss 7.1.1
- Test infrastructure
- This week:
- More JPA 2.1 test suites enabled in GF4
- IPv4/IPv6 dual stack tests
JPA
- JPA 2.1 work progress.
- Mostly feature complete
- Treat ongoing
- Entity Graphs changing in the spec
- JPA-RS
- JPA-RS: Respect "Accept" header for SingleResultQuery
- JPA-RS: XMLMarshalException when executing a named query (XML) assigned
- JPA-RS: NPE when executing a named query (JSON)
MOXy / SDO
2.4.2
- Performance
- JAXB context initialization and annotation processing during application deployment
2.5.0
- MOXy footprint reduction
- Phase #3 - Refactor the internal.oxm classes
- Phase #5 - Implement Light Weight OXM Version of Core Classes/Interfaces
- MOXy NamedObjectGraphs
DBWS
2.5
- Conversion from native metadata
EclipseLink Incubator
EclipseLink/Development/Incubation
- Time to create separate sub-project for incubator
- Increase community of committers
- Try out GIT & eGit/jGit tooling in incubator?
Documentation
- EclipseLink 2.4 library: http://www.eclipse.org/eclipselink/documentation/2.4/
- EclipseLink 2.5 doc library: available: http://www.eclipse.org/eclipselink/documentation/2.5/
- Updated all doc custom search engines: http://www.eclipse.org/eclipselink/documentation/
- All docs remain in a rolling review:
- Concepts Guide
- Solutions Guide (includes installation and migration information)
- JPA Extensions Reference
- Developing JAXB with EL MOXy
- Developing with EL DBWS
- Next refresh planned Apr 1, 2013