Line 15: | Line 15: | ||
*Release Candidate 1 (9/23/2011) | *Release Candidate 1 (9/23/2011) | ||
*0.7.0 Availability (9/30/2011) | *0.7.0 Availability (9/30/2011) | ||
+ | |||
+ | |||
+ | |||
+ | ==== Planning Spreadsheet ==== | ||
+ | [[Media:EDT_070_Planning.zip]] This zip file contains an Excel spreadsheet used for planning the release content. (The wiki doesn't allow us to attach .xls files.) Before editing the spreadsheet, "lock" it by putting your name next to the link. Remove your name after you update the spreadsheet. | ||
[[Category:EDT]] | [[Category:EDT]] |
Revision as of 12:17, 25 July 2011
- Milestone 1 (5/27/2011)
- EDT:0.7.0 Planning:Iteration 4 (4/4-4/15)
- EDT:0.7.0 Planning:Iteration 5 (4/18-4/29)
- EDT:0.7.0 Planning:Iteration 6 (5/2-5/13)
- EDT:0.7.0 Planning:Iteration 7 (5/16-5/27)
- Milestone 2 (8/5/2011)
- EDT:0.7.0 Planning:Iteration 8 (5/31-6/17)
- EDT:0.7.0 Planning:Iteration 9 (6/20-7/8)
- EDT:0.7.0 Planning:Iteration 10 (7/11-7/22)
- EDT:0.7.0 Planning:Iteration 11 (7/25-8/5)
- Milestone 3 (9/16/2011)
- EDT:0.7.0 Planning:Iteration 12 (8/8-8/19)
- EDT:0.7.0 Planning:Iteration 13 (8/22-9/2)
- EDT:0.7.0 Planning:Iteration 14 (9/5-9/16) - final cleanup
- Release Candidate 1 (9/23/2011)
- 0.7.0 Availability (9/30/2011)
Planning Spreadsheet
Media:EDT_070_Planning.zip This zip file contains an Excel spreadsheet used for planning the release content. (The wiki doesn't allow us to attach .xls files.) Before editing the spreadsheet, "lock" it by putting your name next to the link. Remove your name after you update the spreadsheet.