Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "EDT:0.7.0 Planning"

 
Line 1: Line 1:
*0.7.0 Availability (date to be determined) - new Availability date will be determined by Sept 30
+
*0.7.0 Availability (December 2)  
*Release Candidate 1 (date to be determined)  
+
*Release Candidate 1 (date to be determined, M3 would be first RC)  
*System Verification Test (SVT) (9/19- ??) 
+
*System Verification Test (SVT) (9/19- 11/30)
 
**[https://docs.google.com/spreadsheet/ccc?key=0AikHAJQpuLgFdHpFbzJBMmNYLXhYa1dneG84LS1neHc&hl=en_US SVT Plan doc]
 
**[https://docs.google.com/spreadsheet/ccc?key=0AikHAJQpuLgFdHpFbzJBMmNYLXhYa1dneG84LS1neHc&hl=en_US SVT Plan doc]
 
**[http://wiki.eclipse.org/EDT:v07_green_threads Green Threads] - SVT Entrance criteria
 
**[http://wiki.eclipse.org/EDT:v07_green_threads Green Threads] - SVT Entrance criteria
  
*Milestone 3 (10/18/2011)  
+
*Milestone 3 (10/25/2011)  
**Driver Stabilization (10/3-10/14)
+
**Driver Stabilization (10/3-10/21)
 
**[[EDT:0.7.0 Planning:Iteration 15]] (9/19-9/30)  
 
**[[EDT:0.7.0 Planning:Iteration 15]] (9/19-9/30)  
 
**[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16)  
 
**[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16)  

Latest revision as of 15:59, 20 October 2011

  • 0.7.0 Availability (December 2)
  • Release Candidate 1 (date to be determined, M3 would be first RC)
  • System Verification Test (SVT) (9/19- 11/30)

Back to the top