* Milestone 1 (5/27/2011) - focus on Innovate 2011
+
*0.7.0 Availability (December 2)
** [[EDT:0.7.0 Planning:Iteration 4]] (4/4-4/15)
+
*Release Candidate 1 (date to be determined, M3 would be first RC)
** [[EDT:0.7.0 Planning:Iteration 5]] (4/18-4/29)
+
*System Verification Test (SVT) (9/19- 11/30)
** [[EDT:0.7.0 Planning:Iteration 6]] (5/2-5/13)
+
**[https://docs.google.com/spreadsheet/ccc?key=0AikHAJQpuLgFdHpFbzJBMmNYLXhYa1dneG84LS1neHc&hl=en_US SVT Plan doc]
** [[EDT:0.7.0 Planning:Iteration 7]] (5/16-5/27)
+
**[http://wiki.eclipse.org/EDT:v07_green_threads Green Threads] - SVT Entrance criteria
* Milestone 2 (7/22/2011) - focus on expanding major features (extensibility, IDE, debug, generators, runtimes, services, RUI), and adding data base support
+
 
** [[EDT:0.7.0 Planning:Iteration 8]] (5/31-6/17)
+
*Milestone 3 (10/25/2011)
** [[EDT:0.7.0 Planning:Iteration 9]] (6/20-7/8)
+
**Driver Stabilization (10/3-10/21)
** [[EDT:0.7.0 Planning:Iteration 10]] (7/11-7/22)
+
**[[EDT:0.7.0 Planning:Iteration 15]] (9/19-9/30)  
* Milestone 3 (8/19/2011) - focus on fit and finish of all components
+
**[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16)  
** [[EDT:0.7.0 Planning:Iteration 11]] (7/25-8/5)
+
**[[EDT:0.7.0 Planning:Iteration 13]] (8/22-9/2)  
** [[EDT:0.7.0 Planning:Iteration 12]] (8/8-8/19)
+
**[[EDT:0.7.0 Planning:Iteration 12]] (8/8-8/19)
** [[EDT:0.7.0 Planning:Iteration 13]] (8/22-9/2)
+
 
* Release Candidate 1 (9/9/2011)
+
*Milestone 2 (8/5/2011)  
* Final Build (9/16/2011)
+
**[[EDT:0.7.0 Planning:Iteration 11]] (7/25-8/5)  
 +
**[[EDT:0.7.0 Planning:Iteration 10]] (7/11-7/22)  
 +
**[[EDT:0.7.0 Planning:Iteration 9]] (6/20-7/8)  
 +
**[[EDT:0.7.0 Planning:Iteration 8]] (5/31-6/17)
 +
 
 +
*Milestone 1 (5/27/2011)  
 +
**[[EDT:0.7.0 Planning:Iteration 7]] (5/16-5/27)  
 +
**[[EDT:0.7.0 Planning:Iteration 6]] (5/2-5/13)  
 +
**[[EDT:0.7.0 Planning:Iteration 5]] (4/18-4/29)  
 +
**[[EDT:0.7.0 Planning:Iteration 4]] (4/4-4/15)
  
 
[[Category:EDT]]
 
[[Category:EDT]]

Latest revision as of 15:59, 20 October 2011

  • 0.7.0 Availability (December 2)
  • Release Candidate 1 (date to be determined, M3 would be first RC)
  • System Verification Test (SVT) (9/19- 11/30)