Difference between revisions of "EDT:0.7.0 Planning"
(27 intermediate revisions by 5 users not shown) | |||
Line 1: | Line 1: | ||
− | * | + | *0.7.0 Availability (December 2) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | *Release Candidate 1 (date to be determined, M3 would be first RC) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | *System Verification Test (SVT) (9/19- 11/30) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | **[https://docs.google.com/spreadsheet/ccc?key=0AikHAJQpuLgFdHpFbzJBMmNYLXhYa1dneG84LS1neHc&hl=en_US SVT Plan doc] |
− | ** [[EDT:0.7.0 Planning:Iteration | + | **[http://wiki.eclipse.org/EDT:v07_green_threads Green Threads] - SVT Entrance criteria |
− | * Milestone 2 ( | + | |
− | ** [[EDT:0.7.0 Planning:Iteration | + | *Milestone 3 (10/25/2011) |
− | ** [[EDT:0.7.0 Planning:Iteration 9]] | + | **Driver Stabilization (10/3-10/21) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | **[[EDT:0.7.0 Planning:Iteration 15]] (9/19-9/30) |
− | * Milestone | + | **[[EDT:0.7.0 Planning:Iteration 14]] (9/5-9/16) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | **[[EDT:0.7.0 Planning:Iteration 13]] (8/22-9/2) |
− | ** [[EDT:0.7.0 Planning:Iteration | + | **[[EDT:0.7.0 Planning:Iteration 12]] (8/8-8/19) |
− | * | + | |
− | * | + | *Milestone 2 (8/5/2011) |
− | * | + | **[[EDT:0.7.0 Planning:Iteration 11]] (7/25-8/5) |
+ | **[[EDT:0.7.0 Planning:Iteration 10]] (7/11-7/22) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 9]] (6/20-7/8) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 8]] (5/31-6/17) | ||
+ | |||
+ | *Milestone 1 (5/27/2011) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 7]] (5/16-5/27) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 6]] (5/2-5/13) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 5]] (4/18-4/29) | ||
+ | **[[EDT:0.7.0 Planning:Iteration 4]] (4/4-4/15) | ||
[[Category:EDT]] | [[Category:EDT]] |
Latest revision as of 15:59, 20 October 2011
- 0.7.0 Availability (December 2)
- Release Candidate 1 (date to be determined, M3 would be first RC)
- System Verification Test (SVT) (9/19- 11/30)
- SVT Plan doc
- Green Threads - SVT Entrance criteria
- Milestone 3 (10/25/2011)
- Driver Stabilization (10/3-10/21)
- EDT:0.7.0 Planning:Iteration 15 (9/19-9/30)
- EDT:0.7.0 Planning:Iteration 14 (9/5-9/16)
- EDT:0.7.0 Planning:Iteration 13 (8/22-9/2)
- EDT:0.7.0 Planning:Iteration 12 (8/8-8/19)
- Milestone 2 (8/5/2011)
- EDT:0.7.0 Planning:Iteration 11 (7/25-8/5)
- EDT:0.7.0 Planning:Iteration 10 (7/11-7/22)
- EDT:0.7.0 Planning:Iteration 9 (6/20-7/8)
- EDT:0.7.0 Planning:Iteration 8 (5/31-6/17)
- Milestone 1 (5/27/2011)
- EDT:0.7.0 Planning:Iteration 7 (5/16-5/27)
- EDT:0.7.0 Planning:Iteration 6 (5/2-5/13)
- EDT:0.7.0 Planning:Iteration 5 (4/18-4/29)
- EDT:0.7.0 Planning:Iteration 4 (4/4-4/15)