Skip to main content

Notice: This Wiki is now read only and edits are no longer possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "E4/Meeting Minutes/Status 20101007"

(Status)
(Discussion)
Line 22: Line 22:
 
* cocoa enhancer
 
* cocoa enhancer
 
* being able to contribute to a model based on XPath expressions
 
* being able to contribute to a model based on XPath expressions
 
== Discussion ==
 
 
'''Schedule:'''
 
* RC3 builds:
 
** Friday 1130
 
** Friday 1900
 
** Saturday 1900
 
** Sunday 1300 (only if necessary)
 
* Additional post-RC3 builds for critical or stop-ship problems
 
* Some releng issues that may require builds (signing, p2 repository categories)
 
 
'''Focus for next week:'''
 
* Look for stop ship issues
 
* Updating wiki docs, etc
 

Revision as of 11:17, 7 October 2010

Attendees

  • Bogdan
  • Eric
  • Oleg
  • Paul
  • Remy
  • Boris
  • Brian
  • Tom
  • McQ

Status

  • Worked with SWT to fix the focus issues we were seeing with the JDT breadcrumb
  • Drag & Drop (support dragging trim controls/toolbars)
  • changes to the context logic
  • working on menu ordering (on a branch, using Git to rebase)
  • we cannot build from Git yet, Paul had to postpone this a bit
  • fixing bugs (Thanks to Pradeep, Hitesh, Olivier & Dani for the great feedback)
  • implementing activation history
  • cocoa enhancer
  • being able to contribute to a model based on XPath expressions

Back to the top