Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP project meeting, November 14, 2013"

 
Line 10: Line 10:
 
* Luna Milestone 3 is this week.  We are still contributing our master (1.11.2) stream into Luna.
 
* Luna Milestone 3 is this week.  We are still contributing our master (1.11.2) stream into Luna.
 
* Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.
 
* Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.
 +
* The next meeting would fall on Thanksgiving Day (US), so we will skip that meeting and meet again on December 12.

Latest revision as of 20:19, 14 November 2013

Back to DTP Meetings, 2013 page


Attendees

  • Linda Chan (Actuate)
  • Brian Payton (IBM)

Minutes

  • Brian will start updating the enablement plugins for DB2 shortly. Yeah!
  • Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12.
  • Luna Milestone 3 is this week. We are still contributing our master (1.11.2) stream into Luna.
  • Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.
  • The next meeting would fall on Thanksgiving Day (US), so we will skip that meeting and meet again on December 12.

Copyright © Eclipse Foundation, Inc. All Rights Reserved.