Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP project meeting, November 14, 2013"

(Created page with "{{Back To|name=DTP Meetings, 2013 page|href=DTP Meetings, 2013}} ==Attendees== * Linda Chan (Actuate) * Brian Payton (IBM) ==Minutes== * Brian will start updating the enable...")
 
Line 9: Line 9:
 
* Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12.
 
* Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12.
 
* Luna Milestone 3 is this week.  We are still contributing our master (1.11.2) stream into Luna.
 
* Luna Milestone 3 is this week.  We are still contributing our master (1.11.2) stream into Luna.
* Linda and Brian will continue scrubbing the DTP defect list today at a later meeting.
+
* Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.

Revision as of 20:18, 14 November 2013

Back to DTP Meetings, 2013 page


Attendees

  • Linda Chan (Actuate)
  • Brian Payton (IBM)

Minutes

  • Brian will start updating the enablement plugins for DB2 shortly. Yeah!
  • Brian or the Build team will need to move all the changes in the master branch (1.11.2) into the 1.12 branch before adding more stuff to 1.12.
  • Luna Milestone 3 is this week. We are still contributing our master (1.11.2) stream into Luna.
  • Linda and Brian continued scrubbing the DTP defect list, ending with bug 191304.

Back to the top