Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

DTP project meeting, June 29, 2011

Back to DTP Meetings, 2011 page


Attendees

  • Linda Chan (Actuate)
  • Hemant Kolwalkar (IBM)
  • Brian Payton (IBM)

Minutes

  • Linda has sent out a proposal on moving the DTP source code from CVS to Git. She took us through her proposal for organizing the existing projects and plugins in Git. She is waiting for input from Fitz before putting the proposal on dtp-dev. Actuate is planning to do the migration in a few weeks.
  • The Build team has already branched out DTP 1.9. They are not currently building 1.9.1; they are planning to wait until after the migration to Git.
  • Linda has created the target milestone for DTP 1.9.1 in Bugzilla. We still need to set up the milestone schedule for 1.9.1 in the wiki and the project info.

Copyright © Eclipse Foundation, Inc. All Rights Reserved.