Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP Project Lead Meeting Minutes: December 14, 2009"

(New page: ← Back to DTP Project Lead Meeting Minutes: 2009, October through December page ==Attendees== *Brian "Fitz" Fitz...)
 
 
Line 10: Line 10:
 
* Fitz has put in two EclipseCon talk proposals.
 
* Fitz has put in two EclipseCon talk proposals.
 
* Linda has registered for EC
 
* Linda has registered for EC
*...
+
* Linda said there is a patch submitted for the ODA driver for EMF. She said she will ask Tim Meyers (committer on the Incubation project) to review.
 +
* Brian has been going through the DTP bugs, particularly the ones without target milestones.
 +
* We had planned to branch for 1.8 (Helios) right after the M4 milestone, but after sone discussion we decided to move that to right after M5, since there isn't any 1.8-specific changes going on, and we don't want to do double-work if we can avoid it.
 +
* Brian said the group that packages Ecipse for use in IBM has reported a problem where DTP builds are disappearing too quickly.  He will follow up with the build team.
 +
* Hemant has two bug fixes to check in.
 +
* No PMC meeting tomorrow.

Latest revision as of 22:39, 14 December 2009

Back to DTP Project Lead Meeting Minutes: 2009, October through December page

Attendees

  • Brian "Fitz" Fitzpatrick (Red Hat)
  • Linda Chan (Actuate)
  • Brian Payton (IBM)

Minutes

  • Brian updated the Project Information "simultaneousrelease" entry to indicate that DTP is part of the Helios release train
  • Fitz has put in two EclipseCon talk proposals.
  • Linda has registered for EC
  • Linda said there is a patch submitted for the ODA driver for EMF. She said she will ask Tim Meyers (committer on the Incubation project) to review.
  • Brian has been going through the DTP bugs, particularly the ones without target milestones.
  • We had planned to branch for 1.8 (Helios) right after the M4 milestone, but after sone discussion we decided to move that to right after M5, since there isn't any 1.8-specific changes going on, and we don't want to do double-work if we can avoid it.
  • Brian said the group that packages Ecipse for use in IBM has reported a problem where DTP builds are disappearing too quickly. He will follow up with the build team.
  • Hemant has two bug fixes to check in.
  • No PMC meeting tomorrow.

Back to the top