Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: September 22, 2008"

(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Linda Chan *Sheila Sholars *Brian Payton *Larry Dunnell *Der P...)
 
Line 3: Line 3:
 
==Attendees==
 
==Attendees==
 
*Brian Fitzpatrick
 
*Brian Fitzpatrick
*Linda Chan
 
 
*Sheila Sholars
 
*Sheila Sholars
 
*Brian Payton
 
*Brian Payton
Line 13: Line 12:
  
 
==Regrets==
 
==Regrets==
 +
*Linda Chan
  
 
==Agenda==
 
==Agenda==
* TBD
+
* 1.6.1 is done barring any last minute end of the world crises (knock on wood)! We resolved nearly 150 bugs during all the various milestones of 1.6.1! Thanks for everybody's hard work!
* [Weekly Nag] We are at X bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
+
* Now the focus has to start shifting to 1.6.2 and Galileo. Galileo's release is just 8 months away. As always, there's a lot of work to be done. I'm hoping we can branch the first week of October (next week sometime) and start getting things going on that front.
 +
* [Weekly Nag] We are at 24 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
 
* Sub-project status (from team leads)
 
* Sub-project status (from team leads)
 
* Open discussion
 
* Open discussion

Revision as of 11:17, 22 September 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Sheila Sholars
  • Brian Payton
  • Larry Dunnell
  • Der Ping Chou
  • Emily Kapner
  • Hung Hsi
  • John Graham

Regrets

  • Linda Chan

Agenda

  • 1.6.1 is done barring any last minute end of the world crises (knock on wood)! We resolved nearly 150 bugs during all the various milestones of 1.6.1! Thanks for everybody's hard work!
  • Now the focus has to start shifting to 1.6.2 and Galileo. Galileo's release is just 8 months away. As always, there's a lot of work to be done. I'm hoping we can branch the first week of October (next week sometime) and start getting things going on that front.
  • [Weekly Nag] We are at 24 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Copyright © Eclipse Foundation, Inc. All Rights Reserved.