Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: October 30, 2006"
(5 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | ←[[DTP PMC | + | ←[[DTP PMC and Project Lead Meeting | Back to DTP PMC and Project Lead Meeting page]] |
==Attendees== | ==Attendees== | ||
* John Graham | * John Graham | ||
Line 5: | Line 5: | ||
* Sheila Sholars | * Sheila Sholars | ||
* Rob Cernich | * Rob Cernich | ||
+ | * Der Ping Chou | ||
+ | |||
==Absent== | ==Absent== | ||
* Brian Payton | * Brian Payton | ||
* Hung Hsi | * Hung Hsi | ||
==Minutes== | ==Minutes== | ||
− | * | + | * Description of [http://dev.eclipse.org/mhonarc/lists/dtp-pmc/msg00244.html DTP stats from dtp-pmc mailing list]. |
+ | * DTP 1.0 API process discussion. Proposal: | ||
+ | ** DTP project leads drive API definition | ||
+ | ** All DTP 1.0 API are [http://www.eclipse.org/projects/dev_process/eclipse-quality.php provisional] | ||
+ | ** All Java API and extension points used by exemplary tools must be included | ||
+ | ** If there are some API or extension points that can not be ready by 1.0, this must be clearly marked in the JavaDoc to avoid creating confusion in the adopter community | ||
+ | ** Project leads to propose extension point and Java API to PMC by '''November 15 (Wed.)''' | ||
+ | ** After 11/15, the ISV help plug-in will be rebuilt to include only those items proposed and will be circulated to the community for review between 11/15 and '''December 1 (Fri.)''' | ||
+ | ** Essentially, this will complete the DTP 1.0 API review cycle for the [http://www.eclipse.org/datatools/pmc/project_plans/dtp_1_0_project_plan.html DTP 1.0RC1 build] | ||
+ | ==Action Items== | ||
+ | * '''PMC:''' Determine DTP API policy. The base suggestion is to model after the Eclipse platform | ||
+ | * '''Project Leads:''' Finalize discussion on API review plan (see above) by '''November 3 (Fri.)'''. If no objections requiring modification to the above plan are registered by 5EST on 11/3, the PMC will consider that all project leads have agreed to it and committed to delivery on the dates mentioned in the plan |
Latest revision as of 12:19, 6 July 2007
← Back to DTP PMC and Project Lead Meeting page
Contents
Attendees
- John Graham
- Linda Chan
- Sheila Sholars
- Rob Cernich
- Der Ping Chou
Absent
- Brian Payton
- Hung Hsi
Minutes
- Description of DTP stats from dtp-pmc mailing list.
- DTP 1.0 API process discussion. Proposal:
- DTP project leads drive API definition
- All DTP 1.0 API are provisional
- All Java API and extension points used by exemplary tools must be included
- If there are some API or extension points that can not be ready by 1.0, this must be clearly marked in the JavaDoc to avoid creating confusion in the adopter community
- Project leads to propose extension point and Java API to PMC by November 15 (Wed.)
- After 11/15, the ISV help plug-in will be rebuilt to include only those items proposed and will be circulated to the community for review between 11/15 and December 1 (Fri.)
- Essentially, this will complete the DTP 1.0 API review cycle for the DTP 1.0RC1 build
Action Items
- PMC: Determine DTP API policy. The base suggestion is to model after the Eclipse platform
- Project Leads: Finalize discussion on API review plan (see above) by November 3 (Fri.). If no objections requiring modification to the above plan are registered by 5EST on 11/3, the PMC will consider that all project leads have agreed to it and committed to delivery on the dates mentioned in the plan