Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: June 9, 2008"

(Attendees)
(Attendees)
 
(4 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
*Linda Chan
 
*Linda Chan
 
*Hung Hsi
 
*Hung Hsi
 
 
*John Graham
 
*John Graham
*Brian Payton
 
 
*Der Ping Chou
 
*Der Ping Chou
  
 
==Regrets==
 
==Regrets==
 +
*Brian Payton
  
 
==Agenda==
 
==Agenda==
 
* Servers frozen to get RC3 up for download  
 
* Servers frozen to get RC3 up for download  
 
* RC4 candidate will go up later today (early Tuesday SH time) for testing on 3.3.2 and 3.4
 
* RC4 candidate will go up later today (early Tuesday SH time) for testing on 3.3.2 and 3.4
* Doshiro status - Hung, thanks for providing CVS/SVN package info -- waiting on status update from emo
+
* Doshiro status - Hung, thanks for providing CVS/SVN package info -- emo's just overwhelmed at the moment with IP concerns, will get back to committer paperwork soon
 
* Help jars were delivered on Friday, should be integrated with the RC4 candidate this week for testing
 
* Help jars were delivered on Friday, should be integrated with the RC4 candidate this week for testing
 
* We are at 20 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.
 
* We are at 20 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.

Latest revision as of 14:06, 9 June 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Larry Dunnell
  • Emily Kapner
  • Sheila Sholars
  • Linda Chan
  • Hung Hsi
  • John Graham
  • Der Ping Chou

Regrets

  • Brian Payton

Agenda

  • Servers frozen to get RC3 up for download
  • RC4 candidate will go up later today (early Tuesday SH time) for testing on 3.3.2 and 3.4
  • Doshiro status - Hung, thanks for providing CVS/SVN package info -- emo's just overwhelmed at the moment with IP concerns, will get back to committer paperwork soon
  • Help jars were delivered on Friday, should be integrated with the RC4 candidate this week for testing
  • We are at 20 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible.

https://bugs.eclipse.org/bugs/buglist.cgi?query_format=advanced&short_desc_type=allwordssubstr&short_desc=&classification=DataTools&product=Data+Tools&target_milestone=---&long_desc_type=allwordssubstr&long_desc=&bug_file_loc_type=allwordssubstr&bug_file_loc=&status_whiteboard_type=allwordssubstr&status_whiteboard=&keywords_type=allwords&keywords=&bug_status=UNCONFIRMED&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&emailtype1=substring&email1=&emailtype2=substring&email2=&bugidtype=include&bug_id=&votes=&chfieldfrom=&chfieldto=Now&chfieldvalue=&cmdtype=doit&order=Reuse+same+sort+as+last+time&field0-0-0=noop&type0-0-0=noop&value0-0-0=

  • Sub-project status (from team leads)
  • Open discussion

Minutes

Action Items

Back to the top