Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: July 14, 2008"

(Regrets)
(Minutes)
 
Line 33: Line 33:
  
 
==Minutes==
 
==Minutes==
 +
* Will discuss 1.6.1 milestone/early release at PMC meeting tomorrow.
  
 
==Action Items==
 
==Action Items==
  
 
[[Category:Data Tools Platform]]
 
[[Category:Data Tools Platform]]

Latest revision as of 14:21, 14 July 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Larry Dunnell
  • Hung Hsi
  • Brian Payton
  • Linda Chan
  • John Graham
  • Sheila Sholars

Regrets

  • Emily Kapner
  • Der Ping Chou

Agenda

  • Proposed dates for 1st maintenance release (SR1) train
    • RC1 - September 2, 2008, with EPP on Sept 8, Server freeze on Sept 9, and public access on Sept 10
    • RC2 - September 9, 2008, with EPP on Sept 15, Server freeze on Sept 16, and public access on Sept 17
    • Ganymede SR1 - September 15, 2008, with EPP on Sept 22, Server freeze on Sept 23, and public access on Sept 24
  • This roughly corresponds to our rampdown suggestion of doing a milestone build (1.6.1 M2) for August 29 the week before SR1 RC1 (probably based on the August 28 integration build).
  • IBM (LJ) has requested that we adjust our build schedule slightly (from 7/25) to meet an August 7 deadline. We've suggested that we compromise and move our M1 build to August 1 and do a few days of testing after that.
  • To summarize ('cause I think I just threw enough dates in there it looks like they were in a blender on puree)...
    • 1) We shift the DTP 1.6.1 M1 date to August 1, 2008, which is effectively the 7/31 SH build.
    • 2) We lock down changes to the 1.6/1.6.1 stream from Aug 1 to Aug 7, except for any critical fixes deemed required for the milestone.
    • 3) On Aug 7, we release 1.6.1 M1 publicly and re-open the 1.6/1.6.1 stream for continued development.
    • 4) With the proposed rampdown for the maintenance release train, we shift the DTP 1.6.1 M2 date to August 29 (effectively the August 28th SH build for us).
    • 5) From that point forward, we roll with the standard rampdown policy for RC1 (effectively our M2) and RC2 of the SR1 release train.
  • The goal here is not to force an early release of 1.6.1 if we can help it and just adjust dates for the M1 & M2 milestone builds a bit.
  • We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Sub-project status (from team leads)
  • Open discussion

Minutes

  • Will discuss 1.6.1 milestone/early release at PMC meeting tomorrow.

Action Items

Back to the top