Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: August 4, 2008"

(Agenda)
(Minutes)
 
(5 intermediate revisions by the same user not shown)
Line 4: Line 4:
 
*Brian Fitzpatrick
 
*Brian Fitzpatrick
 
*Larry Dunnell
 
*Larry Dunnell
*John Graham
 
*Linda Chan
 
*Emily Kapner
 
 
*Sheila Sholars
 
*Sheila Sholars
 +
*Emily Kapner
 
*Hung Hsi
 
*Hung Hsi
 +
*John Graham
 +
*Linda Chan
 
*Der Ping Chou
 
*Der Ping Chou
*Brian Payton
 
  
 
==Regrets==
 
==Regrets==
 +
*Brian Payton
  
 
==Agenda==
 
==Agenda==
* Status of 1.6.1 M1 (Thanks to Xiaoying for building it and getting it up on the downloads page, Loic & his team are currently testing the build)
+
* Status of 1.6.1 M1 (Thanks to Xiaoying for building it and getting it up on the downloads page, Loic & his team are currently testing the build) (Build available [http://www.eclipse.org/downloads/download.php?file=/datatools/downloads/drops/N_DTP_1.6.1/dtp-sdk-1.6.1M1-200808040600.zip[here]])
 
* Next major release is officially "Galileo" for June 2009. I've created a target milestone for Galileo so we can start marking those bugs/enhancements we feel should to into it. Please move any you know should go into Galileo into that target milestone.
 
* Next major release is officially "Galileo" for June 2009. I've created a target milestone for Galileo so we can start marking those bugs/enhancements we feel should to into it. Please move any you know should go into Galileo into that target milestone.
 
* We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
 
* We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
Line 22: Line 22:
  
 
==Minutes==
 
==Minutes==
 +
* Sheila brought up the last possible time for checkins to the M1 stream - decided it would be the afternoon of Tuesday, August 5, which would be the morning of August 6 in Shanghai for a build. So we will wait to see if any additional changes are required and request a build (if necessary) from Xiaoying.
  
 
==Action Items==
 
==Action Items==
  
 
[[Category:Data Tools Platform]]
 
[[Category:Data Tools Platform]]

Latest revision as of 14:53, 4 August 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Larry Dunnell
  • Sheila Sholars
  • Emily Kapner
  • Hung Hsi
  • John Graham
  • Linda Chan
  • Der Ping Chou

Regrets

  • Brian Payton

Agenda

  • Status of 1.6.1 M1 (Thanks to Xiaoying for building it and getting it up on the downloads page, Loic & his team are currently testing the build) (Build available [here])
  • Next major release is officially "Galileo" for June 2009. I've created a target milestone for Galileo so we can start marking those bugs/enhancements we feel should to into it. Please move any you know should go into Galileo into that target milestone.
  • We are at 30+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Sub-project status (from team leads)
  • Open discussion

Minutes

  • Sheila brought up the last possible time for checkins to the M1 stream - decided it would be the afternoon of Tuesday, August 5, which would be the morning of August 6 in Shanghai for a build. So we will wait to see if any additional changes are required and request a build (if necessary) from Xiaoying.

Action Items