Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: August 18, 2008"

(Attendees)
(Minutes)
 
(One intermediate revision by the same user not shown)
Line 11: Line 11:
 
*Linda Chan
 
*Linda Chan
  
 +
==Regrets==
 
*Hung Hsi
 
*Hung Hsi
 
==Regrets==
 
  
 
==Agenda==
 
==Agenda==
Line 29: Line 28:
  
 
==Minutes==
 
==Minutes==
 +
* Will use the Monday (SH time) build as the M2 build, which means folks can check in fixes until Sunday afternoon
 +
* Emily has worked with Xiaoying to update the documentation files & features to fix some of the 1.6.1 doc issues and is waiting for a build to verify that things are fixed
  
 
==Action Items==
 
==Action Items==
  
 
[[Category:Data Tools Platform]]
 
[[Category:Data Tools Platform]]

Latest revision as of 14:14, 18 August 2008

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Emily Kapner
  • John Graham
  • Sheila Sholars
  • Brian Payton
  • Larry Dunnell
  • Der Ping Chou
  • Linda Chan

Regrets

  • Hung Hsi

Agenda

  • DTP 1.6.1 M1 was released August 14th!
    • Many thanks to Loic, Xiaoying, Larry, and Sheila for guiding it to completion
  • Next important date -- M2 is August 25, 2008
  • After that, we'll be on the Ganymede SR1 release train as a +1 project. You can see those dates [[here].
    • September 2, 2008 - RC1
    • September 9, 2008 - RC2
    • September 16, 2008 - RC3 (Final Release, available September 24, 2008)
  • Thanks for dispositioning some of the 1.6.1 target milestone bugs to M2, 1.6.2, or Galileo. Four bugs still remain. See them [here].
  • We are at 20+ bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Sub-project status (from team leads)
  • Open discussion

Minutes

  • Will use the Monday (SH time) build as the M2 build, which means folks can check in fixes until Sunday afternoon
  • Emily has worked with Xiaoying to update the documentation files & features to fix some of the 1.6.1 doc issues and is waiting for a build to verify that things are fixed

Action Items

Back to the top