Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: April 30, 2007"

(New page: ← Back to DTP PMC & Project Lead Meeting page ==Attendees== ==Agenda== *Individual project status ==Minutes== ==Action Items==)
 
 
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
←[[DTP PMC & Project Lead Meeting | Back to DTP PMC & Project Lead Meeting page]]
+
←[[DTP PMC and Project Lead Meeting | Back to DTP PMC and Project Lead Meeting page]]
 
==Attendees==
 
==Attendees==
 
+
*John Graham
 +
*Brian Payton
 +
*Sheila Sholars
 +
*Linda Chan
 +
*Hung Hsi
 +
*Samir Nigam
 +
*Rob Cernich
 +
*Der-Ping Chou
 
==Agenda==
 
==Agenda==
 
+
*Reminder: Platform RC0 is due this Friday, May 4. Next week we'll be testing with it for DTP 1.5RC0 promotion on 5/11.
 +
*The [[DTP 1.5 Rampdown Policy | DTP 1.5 Rampdown Policy]] has been updated for the remaining Europa RC dates. Please plan work accordingly.
 +
*(John, Der-Ping): Update on DB support survey.
 +
*Can we get rid of the "Dependencies" node?
 +
*Two recent [http://planeteclipse.org/planet/ Planet Eclipse] entries to note:
 +
**[http://sureshkrishna.wordpress.com/2007/04/30/is-eclipse-getting-eclipsed/ Is Eclipse Getting Eclipsed?]
 +
**[http://niravthaker.blogspot.com/2007/04/closed-development-instance-in-eclipse.html Closed Development Instance in Eclipse]
 +
**Context: [http://en.wikipedia.org/wiki/Jump_the_shark "Jump the shark"]
 
*Individual project status
 
*Individual project status
 
 
==Minutes==
 
==Minutes==
 
+
*(John): Makes announcements posted above.
 +
*(John): Summary of database testing efforts.
 +
*(Der-Ping): Summary of database testing efforts.
 +
*(Der-Ping): Examples of how the Dependencies node is used.
 +
*(John): Summary of the blog posts and why we should care.
 +
*Project status:
 +
**Der-Ping: Availability for database testing.
 +
**Rob: Description of enhancement request 140493. Enhanced DDL generation moved out to RC1. Database recognition extension likely to move to RC1 as well.
 +
**Hung Hsi: Fixed a lot bugs.
 +
**Brian: Nothing to report.
 +
*PMC
 +
**Sheila: Pending discussion about accessibility with PMC.
 +
**Linda: Questions about PII bugs.
 
==Action Items==
 
==Action Items==

Latest revision as of 12:26, 6 July 2007

Back to DTP PMC and Project Lead Meeting page

Attendees

  • John Graham
  • Brian Payton
  • Sheila Sholars
  • Linda Chan
  • Hung Hsi
  • Samir Nigam
  • Rob Cernich
  • Der-Ping Chou

Agenda

Minutes

  • (John): Makes announcements posted above.
  • (John): Summary of database testing efforts.
  • (Der-Ping): Summary of database testing efforts.
  • (Der-Ping): Examples of how the Dependencies node is used.
  • (John): Summary of the blog posts and why we should care.
  • Project status:
    • Der-Ping: Availability for database testing.
    • Rob: Description of enhancement request 140493. Enhanced DDL generation moved out to RC1. Database recognition extension likely to move to RC1 as well.
    • Hung Hsi: Fixed a lot bugs.
    • Brian: Nothing to report.
  • PMC
    • Sheila: Pending discussion about accessibility with PMC.
    • Linda: Questions about PII bugs.

Action Items

Back to the top