Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: April 27, 2009"

(Agenda)
Line 3: Line 3:
 
==Attendees==
 
==Attendees==
 
*Brian Fitzpatrick
 
*Brian Fitzpatrick
*Linda Chan
 
 
*Larry Dunnell
 
*Larry Dunnell
*Hung Hsi
 
*John Graham
 
*Brian Payton
 
 
*Emily Kapner
 
*Emily Kapner
 +
*John Graham
 +
*Linda Chan
 
*Hemant Kolwalkar  
 
*Hemant Kolwalkar  
 +
 +
*Brian Payton
  
 
==Regrets==
 
==Regrets==
 +
*Hung Hsi (meeting conflict)
  
 
==Agenda==
 
==Agenda==

Revision as of 14:02, 27 April 2009

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Larry Dunnell
  • Emily Kapner
  • John Graham
  • Linda Chan
  • Hemant Kolwalkar
  • Brian Payton

Regrets

  • Hung Hsi (meeting conflict)

Agenda

  • Continuation of Galileo compile errors with most recent issues reported against org.eclipse.datatools.enablement.sybase.asa.schemaobjecteditor.examples
  • Issues with the oda design ecore model https://bugs.eclipse.org/bugs/show_bug.cgi?id=256357
  • We still have a big issue with the number of bugs slated for Galileo that will in all likelihood never be completed:
    • Still 26 bugs slated for the "Galileo" milestone that haven't been re-dispositioned (http://tinyurl.com/cvtfjy)
    • Still 30 bugs slated for M7, even though M7 is now in Test & Fix mode (http://tinyurl.com/djoefm)
    • Last chance. I will go through and set all remaining M7 and Galileo bugs to Future on Wednesday afternoon 4/29/09 - 4pm MST. Any bugs after that to be moved to an RC (specifically RC1 or RC2) will have to be approved by the PMC by way of an e-mail to the PMC list with an explanation of why the bug needs to be included.
  • Have added three new milestones - 1.7.1, 1.7.2, and "Next Major Release"
    • The "Next Major Release" milestone is to indicate that we should consider a particular BZ for the following year's major release, not the next maintenance release
  • Status
  • [Weekly Nag] We are at ~15 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Open discussion

Minutes

Action Items

Back to the top