Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC and Project Lead Meeting Minutes: April 13, 2009"

(New page: ← Back to DTP PMC and Project Lead Meeting page ==Attendees== *Brian Fitzpatrick *Linda Chan *Larry Dunnell *Hung Hsi *John Graham *Brian Payton...)
 
(Agenda)
Line 14: Line 14:
  
 
==Agenda==
 
==Agenda==
* [TBD]
+
* Galileo - Roughly 10 days left before the M7 integration build at 5a (SH time) 4/24/09
* Status
+
* Need to start filtering down those BZ entries target for "Galileo" or "M7". Currently we have [https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=&product=Data+Tools&target_milestone=1.7M7&long_desc_type=allwordssubstr&long_desc=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&order=Importance 41 bugs] targeted for M7 and [https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=&product=Data+Tools&target_milestone=Galileo&long_desc_type=allwordssubstr&long_desc=&bug_status=NEW&bug_status=ASSIGNED&bug_status=REOPENED&order=Importance 86 bugs] targeted for "Galileo" with no specific target milestone.
* [Weekly Nag] We are at ~X bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
+
* Galileo Status
 +
* [Weekly Nag] We are at ~8 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [http://tinyurl.com/6robrj[Here's the query.]]
 
* Open discussion
 
* Open discussion
  

Revision as of 11:32, 13 April 2009

Back to DTP PMC and Project Lead Meeting page

Attendees

  • Brian Fitzpatrick
  • Linda Chan
  • Larry Dunnell
  • Hung Hsi
  • John Graham
  • Brian Payton
  • Emily Kapner
  • Hemant Kolwalkar

Regrets

Agenda

  • Galileo - Roughly 10 days left before the M7 integration build at 5a (SH time) 4/24/09
  • Need to start filtering down those BZ entries target for "Galileo" or "M7". Currently we have 41 bugs targeted for M7 and 86 bugs targeted for "Galileo" with no specific target milestone.
  • Galileo Status
  • [Weekly Nag] We are at ~8 bugs with no target milestone set that need to be dispositioned. Please keep at this list daily if at all possible. [Here's the query.]
  • Open discussion

Minutes

Action Items

Back to the top