Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC Meeting May 29, 2007"

 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
 
*John Graham
 
*John Graham
 
*Sheila Sholars
 
*Sheila Sholars
 +
*Linda Chan
 
==Agenda==
 
==Agenda==
 
* (John): Update on DTP 1.5RC2
 
* (John): Update on DTP 1.5RC2
Line 9: Line 10:
 
* Final check on DTP 1.5 Release Review
 
* Final check on DTP 1.5 Release Review
 
==Minutes==
 
==Minutes==
 
+
*DTP 1.5RC2 candidate is on the download site for testing today
 +
*Some consideration about perhaps making an "end-user" wrapper feature or separate category to hide the sheer number of DTP features from Europa users
 +
*IBM testing on 5/24-5/25 went well; a number of bugs filed
 +
*DTP 1.5 release review will be sent to EMO tomorrow morning
 
==Action Items==
 
==Action Items==
 +
*'''(John):''' Create list of inactive committers
 +
**Update, 6/5: Done. Found in [[DTP_PMC_Meeting_June_5%2C_2007 | agenda]] for 6/5 PMC meeting.
 +
*'''(John):''' Ask Bjorn about the committer lists on the portal
 +
**Update, 6/4: Done. A request has been made to Eclipse Legal to correct the list.
 +
*'''(John):''' Prototype end user feature/support category for RC3
 +
**Update, 6/5: Done. Proposal found in [[DTP_PMC_Meeting_June_5%2C_2007 | agenda]] for 6/5 PMC meeting.

Latest revision as of 13:58, 5 June 2007

Back to DTP PMC Meeting Page

Attendees

  • John Graham
  • Sheila Sholars
  • Linda Chan

Agenda

  • (John): Update on DTP 1.5RC2
  • (John): More fun with features...
  • (Sheila): Update from IBM testing on 5/24-25
  • Final check on DTP 1.5 Release Review

Minutes

  • DTP 1.5RC2 candidate is on the download site for testing today
  • Some consideration about perhaps making an "end-user" wrapper feature or separate category to hide the sheer number of DTP features from Europa users
  • IBM testing on 5/24-5/25 went well; a number of bugs filed
  • DTP 1.5 release review will be sent to EMO tomorrow morning

Action Items

  • (John): Create list of inactive committers
    • Update, 6/5: Done. Found in agenda for 6/5 PMC meeting.
  • (John): Ask Bjorn about the committer lists on the portal
    • Update, 6/4: Done. A request has been made to Eclipse Legal to correct the list.
  • (John): Prototype end user feature/support category for RC3
    • Update, 6/5: Done. Proposal found in agenda for 6/5 PMC meeting.

Back to the top