Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC Meeting December 11, 2007"
Line 7: | Line 7: | ||
*DTP 1.5.2/1.6 status and plans | *DTP 1.5.2/1.6 status and plans | ||
*Update on SAP MaxDB contribution ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=197806 BZ197806]) | *Update on SAP MaxDB contribution ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=197806 BZ197806]) | ||
+ | *DTP Incubator proposal update | ||
*Connectivity wizards usability | *Connectivity wizards usability | ||
**Current status | **Current status |
Revision as of 18:15, 5 December 2007
← Back to DTP PMC Meeting Page
Contents
Attendees
(Face to face meeting in San Francisco area)
Regrets
Agenda
- DTP 1.5.2/1.6 status and plans
- Update on SAP MaxDB contribution (BZ197806)
- DTP Incubator proposal update
- Connectivity wizards usability
- Current status
- Planning for Ganymede
- Data Modeling proposal (BZ211987)
- Overview
- Process planning
- New DTP web site
- Overview
- Update plans
- EclipseCon update and community outreach
- Post DTP 1.6: General future direction