Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "DTP PMC Meeting December 11, 2007"
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
==Attendees== | ==Attendees== | ||
(Face to face meeting in San Francisco area) | (Face to face meeting in San Francisco area) | ||
+ | *John Graham | ||
+ | *Linda Chan | ||
+ | *Sheila Sholars | ||
==Regrets== | ==Regrets== | ||
Line 8: | Line 11: | ||
*Update on SAP MaxDB contribution ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=197806 BZ197806]) | *Update on SAP MaxDB contribution ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=197806 BZ197806]) | ||
*DTP Incubator proposal update | *DTP Incubator proposal update | ||
+ | *[[DTP Ganymede Milestone Sign-off Policy | Milestone Sign-off policy for Ganymede]] | ||
*Connectivity wizards usability | *Connectivity wizards usability | ||
**Current status | **Current status | ||
Line 20: | Line 24: | ||
*Post DTP 1.6: General future direction | *Post DTP 1.6: General future direction | ||
==Minutes== | ==Minutes== | ||
− | + | *Brian Fitzpatrick will re-join the Connectivity team on 12/17 | |
+ | *SAP MaxDB contribution IP approved; need to get that component team in place | ||
+ | *John needs to schedule DTP Incubator creation review | ||
+ | *Discussion about Modeling proposal | ||
+ | *Discussion about Connectivity wizards usability | ||
+ | *Agreement on [[DTP Ganymede Milestone Sign-off Policy | Milestone Sign-off policy for Ganymede]] with exclusion for Enablement | ||
==Action Items== | ==Action Items== |
Latest revision as of 12:49, 17 December 2007
← Back to DTP PMC Meeting Page
Contents
Attendees
(Face to face meeting in San Francisco area)
- John Graham
- Linda Chan
- Sheila Sholars
Regrets
Agenda
- DTP 1.5.2/1.6 status and plans
- Update on SAP MaxDB contribution (BZ197806)
- DTP Incubator proposal update
- Milestone Sign-off policy for Ganymede
- Connectivity wizards usability
- Current status
- Planning for Ganymede
- Data Modeling proposal (BZ211987)
- Overview
- Process planning
- New DTP web site
- Overview
- Update plans
- EclipseCon update and community outreach
- Post DTP 1.6: General future direction
Minutes
- Brian Fitzpatrick will re-join the Connectivity team on 12/17
- SAP MaxDB contribution IP approved; need to get that component team in place
- John needs to schedule DTP Incubator creation review
- Discussion about Modeling proposal
- Discussion about Connectivity wizards usability
- Agreement on Milestone Sign-off policy for Ganymede with exclusion for Enablement