Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DTP PMC Meeting, June 9, 2009"

(Agenda)
(Agenda)
Line 9: Line 9:
  
 
==Agenda==
 
==Agenda==
 +
*What are we calling the initial 1.7.1 builds? (Jong/Xiaoying e-mail)
 +
**Do we change the build name from XXX-1.7.1-XXX.zip to XXX-1.7.1M1-XXX.zip?
 
*End of release cleanup list: http://wiki.eclipse.org/Galileo/Final_Daze
 
*End of release cleanup list: http://wiki.eclipse.org/Galileo/Final_Daze
 
*Planning Council proposed dates for Helios (June 2010 release)
 
*Planning Council proposed dates for Helios (June 2010 release)
Line 22: Line 24:
 
**David Williams is looking at starting the simultaneous releases for each milestone of Helios, starting at M1, meaning we would have to branch the 1.7.1 (HEAD) branch much earlier to start a 1.8 (HEAD) branch and have to do dual-development in the two streams. And having initial plans done by early October will be a challenge
 
**David Williams is looking at starting the simultaneous releases for each milestone of Helios, starting at M1, meaning we would have to branch the 1.7.1 (HEAD) branch much earlier to start a 1.8 (HEAD) branch and have to do dual-development in the two streams. And having initial plans done by early October will be a challenge
 
*Any recommendations for an interim PMC lead?  
 
*Any recommendations for an interim PMC lead?  
 +
*Logistics - conference call #s
 
*Open discussion
 
*Open discussion
  

Revision as of 10:38, 9 June 2009

Back to DTP PMC Meeting Page

Attendees

  • Brian Fitzpatrick
  • Linda Chan
  • John Graham
  • Brian Payton

Regrets

Agenda

  • What are we calling the initial 1.7.1 builds? (Jong/Xiaoying e-mail)
    • Do we change the build name from XXX-1.7.1-XXX.zip to XXX-1.7.1M1-XXX.zip?
  • End of release cleanup list: http://wiki.eclipse.org/Galileo/Final_Daze
  • Planning Council proposed dates for Helios (June 2010 release)
    • M1 8/7 - 8/21
    • M2 9/18 - 10/2
    • Initial standard-format plans due 10/2
    • M3 10/30 - 11/13
    • M4 12/11 - 12/18 [note: beginning of 1 week windows]
    • M5 1/29 - 2/5
    • M6 3/12 - 3/19
    • M7 4/30 - 5/7
    • Release: 6/30/2010 (last Wednesday of June)
    • David Williams is looking at starting the simultaneous releases for each milestone of Helios, starting at M1, meaning we would have to branch the 1.7.1 (HEAD) branch much earlier to start a 1.8 (HEAD) branch and have to do dual-development in the two streams. And having initial plans done by early October will be a challenge
  • Any recommendations for an interim PMC lead?
  • Logistics - conference call #s
  • Open discussion

Minutes

Action Items

Tabled for Later Discussion

Copyright © Eclipse Foundation, Inc. All Rights Reserved.