Difference between revisions of "DTP Ganymede Build Schedule"

(New page: ← Back to DTP Main Page ==Status== '''[8/17/07]:''' This document is a '''draft''' and '''should not''' be taken as offical until reviewed and approv...)
 
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
←[[Data Tools Platform Project | Back to DTP Main Page]]
+
{{Back To|name=DTP Main Page|href=Data Tools Platform Project}}
 
==Status==
 
==Status==
 +
'''OBSOLETE'''
  
'''[8/17/07]:''' This document is a '''draft''' and '''should not''' be taken as offical until reviewed and approved by the DTP PMC.
+
'''[3/5/08]:''' This document is obsolete. Refer to the [[DTP Releng | DTP Releng page]] for more information.
  
 
==Introduction==
 
==Introduction==
DTP 1.5 is part of the Europa release. As such, our milestones, release candidates, and final release date are determined by Europa. DTP is a "+1 dependency" on the Eclipse platform, and the dates of specific milestones can be found [[Europa_Simultaneous_Release | here]], Milestones and Release Candidates section. Within these milestones and release candidates, DTP will have regular "integration builds" (or "I-builds") so that adopters can check progress toward eventual milestones. As discussed in the [[DTP_1.5_Project_Plan | DTP 1.5 Project Plan]], DTP will strive to have an I-build as soon as possible after platform milestone and release candidate builds. The purpose of this page is to supplement the project plan with further definition of terms and dates.
+
DTP Ganymede is part of the Ganymede simultaneous release. As such, our milestones, release candidates, and final release date are determined by Ganymede. DTP is a "+1 dependency" on the Eclipse platform, and the dates of specific milestones can be found [[Ganymede_Simultaneous_Release | here]], Milestones and Release Candidates section. Within these milestones and release candidates, DTP will have regular "integration builds" (or "I-builds") so that adopters can check progress toward eventual milestones. As discussed in the [[DTP_Ganymede_Project_Plan | DTP Ganymede Project Plan]], DTP will strive to have an I-build as soon as possible after platform milestone and release candidate builds. The purpose of this page is to supplement the project plan with further definition of terms and dates.
  
 
==Definition of Terms==
 
==Definition of Terms==
Following general Eclipse usage, DTP 1.5 will have the following types of builds:
+
Following general Eclipse usage, DTP Ganymede will have the following types of builds:
  
 
*Nightly Build (N-build): Created from CVS head and posted with minimal testing. Primarily designed for use by committers and adopters requiring certain bug fixes or enhancements as early as possible.
 
*Nightly Build (N-build): Created from CVS head and posted with minimal testing. Primarily designed for use by committers and adopters requiring certain bug fixes or enhancements as early as possible.
Line 15: Line 16:
 
*Release Candidate (RC): Similar to a M-build, but with the expectation that remaining bugs will be fixed in a ramp-down (endgame) mode.
 
*Release Candidate (RC): Similar to a M-build, but with the expectation that remaining bugs will be fixed in a ramp-down (endgame) mode.
  
==DTP 1.5 I-build Dates==
+
==DTP Ganymede I-build Dates==
The following is the projected I-build dates for DTP 1.5. Note that these dates may be adjusted going forward as experience demands, and that hitting each of these dates is a complex function involving many interdependent tasks, so no absolute guarantee can be offered in advance.
+
The following is the projected I-build dates for DTP Ganymede. Note that these dates may be adjusted going forward as experience demands, and that hitting each of these dates is a complex function involving many interdependent tasks, so no absolute guarantee can be offered in advance.
  
*DTP 1.5M5: 2/12 (Monday)
+
*(Dates to be determined.)
*DTP 1.5M6: 2/26 (Monday), 3/12 (Monday), 3/26 (Monday)
+
*DTP 1.5RC0: 4/9 (Monday), 4/23 (Monday), 5/7 (Monday)
+
*DTP 1.5RC1: 5/21 (Monday)
+
  
(After 5/21, the RC builds are frequent enough to serve the same role.)
+
==DTP Ganymede M-build and RC Dates==
 
+
These are determined by the Ganymede schedule and can be found [[Ganymede_Simultaneous_Release | here]], Milestones and Release Candidates section.
==DTP 1.5 M-build and RC Dates==
+
These are determined by the Europa schedule and can be found [[Europa_Simultaneous_Release | here]], Milestones and Release Candidates section.
+
  
 
[[Category:Data Tools Platform]]
 
[[Category:Data Tools Platform]]

Latest revision as of 15:18, 5 March 2008

Back to DTP Main Page

Status

OBSOLETE

[3/5/08]: This document is obsolete. Refer to the DTP Releng page for more information.

Introduction

DTP Ganymede is part of the Ganymede simultaneous release. As such, our milestones, release candidates, and final release date are determined by Ganymede. DTP is a "+1 dependency" on the Eclipse platform, and the dates of specific milestones can be found here, Milestones and Release Candidates section. Within these milestones and release candidates, DTP will have regular "integration builds" (or "I-builds") so that adopters can check progress toward eventual milestones. As discussed in the DTP Ganymede Project Plan, DTP will strive to have an I-build as soon as possible after platform milestone and release candidate builds. The purpose of this page is to supplement the project plan with further definition of terms and dates.

Definition of Terms

Following general Eclipse usage, DTP Ganymede will have the following types of builds:

  • Nightly Build (N-build): Created from CVS head and posted with minimal testing. Primarily designed for use by committers and adopters requiring certain bug fixes or enhancements as early as possible.
  • Integration Build (I-build): A nightly build that is smoke tested for major functionality and found to be in at least reasonable working order.
  • Milestone (M-build): An I-build that has been substantially tested and functioning correctly in all major aspects.
  • Release Candidate (RC): Similar to a M-build, but with the expectation that remaining bugs will be fixed in a ramp-down (endgame) mode.

DTP Ganymede I-build Dates

The following is the projected I-build dates for DTP Ganymede. Note that these dates may be adjusted going forward as experience demands, and that hitting each of these dates is a complex function involving many interdependent tasks, so no absolute guarantee can be offered in advance.

  • (Dates to be determined.)

DTP Ganymede M-build and RC Dates

These are determined by the Ganymede schedule and can be found here, Milestones and Release Candidates section.