Jump to: navigation, search

DTP 1.5 Rampdown Policy

Back to DTP Main Page

Status

2/27: This document is a draft and has not been reviewed/approved by the PMC.

Purpose

This document defines a set of rampdown cycles for DTP 1.5. The goal is to ensure that DTP stability and completeness converges on the 1.5 release dates, while allowing mechanisms for changes as necessary. Since this document is about the rampdown, only cycles post DTP 1.5RC0 will be detailed below.

Rampdown Cycles