Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/TML/roadmap 2008 2009"

< DSDP‎ | TML
(First copy - EHC)
 
(Q2/2008)
Line 13: Line 13:
 
# Contribution to VNC Protocol
 
# Contribution to VNC Protocol
 
# New instance device wizard
 
# New instance device wizard
# Submit paper proposal to FROSCON (end of june)
 
  
 
== Q3/2008 ==
 
== Q3/2008 ==

Revision as of 19:01, 12 August 2008

Tasks and priorities for the TmL project for 2008 and 2009

Please send any comments, suggestions or questions to our mailing list.

Q2/2008

  1. New version of TmL site and wiki
  2. Election of new committers: Daniel Franco and Otavio Ferranti
  3. Election of new project leader: Eric Cloninger
  4. Tutorials to support the current code in CVS
  5. Planning release train after Ganimede
  6. Alignment with LiMo Strategy
  7. Proof of concept for Device Proxy
  8. Contribution to VNC Protocol
  9. New instance device wizard

Q3/2008

  1. Planning and documenting future integration with TM project
  2. New state machine modeling
  3. MOTODEV Studio Integration
  4. Move source base from CVS to SVN and get nightly build scripts running
  5. Modeling Simulated end-to-end environment
  6. Review and Release TmL 0.1
  7. Demonstrate /proc file system viewer
  8. Fix bug of VNC Remote Display

Q4/2008

  1. Release TmL 0.1.1 to support Eclipse Ganymede update 3.4.1, as necessary
  2. First version of Device Proxy
  3. Address bug of VNC Stuff
  4. Refine core framework
  5. First simulated end-to-end environment proof of concept
  6. Release milestone M4 coinciding with those for the release train of Eclipse 3.5

Q1/2009

  1. Release TmL 0.1.2 to support Eclipse Ganymede update 3.4.2, as necessary
  2. Simulated end-to-end environment – first version
  3. EclipseCon2009
    1. Short Talk
    2. Long Talk
    3. Tutorial
  4. Release milestones M5 and M6, coinciding with those for the release train of Eclipse 3.5

Q2/2009

  1. Release milestone M7, coinciding with those for the release train of Eclipse 3.5
  2. Release Candidates RC1 and beyond coinciding with those for the release train of Eclipse 3.5
  3. TmL 0.2 – Release TmL 0.2 with Eclipse 3.5

Q3/2009

  1. Linux and ST demo board samples
  2. TmL 0.3 – Release TmL 0.3

Discussion

Please use the mailing list to discuss this roadmap.(dsdp-tml-dev@eclipse.org)

Back to the top