Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/TML/Agenda09Jan06"

< DSDP‎ | TML
(Summary)
Line 59: Line 59:
 
== Summary ==
 
== Summary ==
  
Release 0.2
+
'''Release 0.2'''
* (FF/EC) Release Review 14-jan
+
* (FF/EC) Release Review 14-Jan
* (FF) Update Site/Download site 15-jan
+
* (FF) Update Site/Download site 15-Jan
 
* Release Notes + News and Noteworthy
 
* Release Notes + News and Noteworthy
** (FF) preparing files 9-jan
+
** (FF) preparing files 9-Jan
** (FF) uploading files 15-jan
+
** (FF) uploading files 15-Jan
* (FF) Ramp Down Policy 0.2 15-jan
+
* (FF) Ramp Down Policy 0.2 15-Jan
 
* Planning 0.2.x releases to be synchronized with internal requirements
 
* Planning 0.2.x releases to be synchronized with internal requirements
  
Yufen contribution
+
'''Yufen Kuo contribution'''
* integrated into 0.2
+
* Integrated into 0.2
* wizard was included only in optional SDK package
+
* Wizard was included only in optional SDK package
* examples has wizard calls commented.
+
* Examples has wizard calls commented.
* why? changes during the integration making the test phase too short to guarantee include this code in 0.2
+
* Changes during the integration making the test phase too short to guarantee including this code in 0.2
* there are a bug to fix samples to 0.2.1 and 0.3
+
* There are a bug to fix samples to 0.2.1 and 0.3
  
Release 0.3M5
+
'''Release 0.3M5'''
* (DF) bugfix 246082 28-jan
+
* (DF) bugfix 246082 28-Jan
* (DF) bugfix 247179 28-jan
+
* (DF) bugfix 247179 28-Jan
 
* (DF) 257288 IP  
 
* (DF) 257288 IP  
**    Verifying dependencies 9-jan
+
**    Verifying dependencies 9-Jan
**    Starting request 16-jan
+
**    Starting request 16-Jan
 
***        (FF) get orbit IP approval for /proc  
 
***        (FF) get orbit IP approval for /proc  
**  Receive Approval until 30-jan
+
**  Receive Approval until 30-Jan
 
* (FF) 257287 Ramp Down Policy  
 
* (FF) 257287 Ramp Down Policy  
**    Draft 16-jan
+
**    Draft 16-Jan
**    Final 30-jan
+
**    Final 30-Jan
* (TBD) 257292 Leverage OSGi ok, review pending 16-jan
+
* (TBD) 257292 Leverage OSGI OK, review pending 16-Jan
* (TBD) 257293 Execution environment ok, review pending 16-jan
+
* (TBD) 257293 Execution environment OK, review pending 16-Jan
* (TBD) 257304 Usability 16-jan
+
* (TBD) 257304 Usability 16-Jan
* (TBD) 257291 Version Numbering ok, review pending 16-jan
+
* (TBD) 257291 Version Numbering OK, review pending 16-Jan
* (TBD) 257303 Localization - ICU4J ok, review pending 16-jan  
+
* (TBD) 257303 Localization - ICU4J OK, review pending 16-Jan  
* (TBD) TW documentation - integrate material produced by TW team - 16-jan
+
* (TBD) TW documentation - integrate material produced by TW team - 16-Jan
 
**      (TBD) 257114 tutorial common package
 
**      (TBD) 257114 tutorial common package
* (DF) Black Duck /proc    9/jan
+
* (DF) Black Duck /proc    9-Jan
* (EC/FF) Start stamp process /proc  13/jan
+
* (EC/FF) Start stamp process /proc  13-Jan
  
Other issues
+
'''Other issues'''
 
* Site review and wiki clean up
 
* Site review and wiki clean up
 
* SVN review
 
* SVN review
** on hold to check environment
+
** On hold to check environment
 
** (FF) open a bug against eclipse site to setup a test module in SVN before migration
 
** (FF) open a bug against eclipse site to setup a test module in SVN before migration
 
* Build scripts
 
* Build scripts
** (FF) working on Richard feedback(received in 5-jan)  9-jan
+
** (FF) working on Richard's feedback (received in 5-Jan)  9-Jan
** (TBD) Phase 2 - change hardcode variables to make nightly build more dynamically and ask to webmaster setup cron table 16-jan
+
** (TBD) Phase 2 - change hard-coded variables to make nightly build more dynamically and ask to webmaster setup cron table 16-Jan
** (TBD) Phase 3 - use common build model (new eclipse feature) 23-jan
+
** (TBD) Phase 3 - use common build model (new eclipse feature) 23-Jan
 
* Live.eclipse.org - M6
 
* Live.eclipse.org - M6
** (TBD) sugestion-> upload slides and video from eclipsecon2008, need some compilation before it.
+
** (TBD) Suggestion-> upload slides and video from eclipsecon2008, need some compilation before it.
 
* (TBD) TM integration - 0.4
 
* (TBD) TM integration - 0.4
 
* ECF and VNC component - 259524
 
* ECF and VNC component - 259524
Line 112: Line 112:
 
* Bugs from internal product integration
 
* Bugs from internal product integration
  
Release 0.3M6
+
'''Release 0.3M6'''
 
* (FF/EC) estimate next steps and define priorities
 
* (FF/EC) estimate next steps and define priorities
 
* (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
 
* (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
Line 126: Line 126:
 
* new bug to javadoc review
 
* new bug to javadoc review
  
Suggestion to postpone
+
'''Suggest to postpone'''
 
* (TBD) 243496 top
 
* (TBD) 243496 top
 
* (TBD) 243497 cpuinfo
 
* (TBD) 243497 cpuinfo
Line 133: Line 133:
 
* (TBD) 247390 validation for properties
 
* (TBD) 247390 validation for properties
  
 
+
'''EclipseCon 2009'''
EclipseCon2009
+
 
* Tutorial - 4hs
 
* Tutorial - 4hs
 
* Long Talk - 1h
 
* Long Talk - 1h
Line 140: Line 139:
 
* How many people? Names? How free tickets will be used?
 
* How many people? Names? How free tickets will be used?
  
Tutorial Format
+
'''Tutorial Format'''
 
* Introduction (5min)
 
* Introduction (5min)
 
* Technical Overview (25 min)  
 
* Technical Overview (25 min)  
Line 150: Line 149:
 
* Q&A (20 min)
 
* Q&A (20 min)
  
V0 --> 26/Jan --> send to Eric review
+
V0 --> 26-Jan --> send to Eric review
V1 --> 30/Jan --> after review (First submission to site)
+
V1 --> 30-Jan --> after review (First submission to site)
Eldorado internal dry run and adjustments - 4 Feb
+
Eldorado internal dry run and adjustments - 4-Feb
Conference call dry run - Feb 6
+
Conference call dry run - 6-Feb
Final submission - Feb 13
+
Final submission - 13-Feb
 
+
 
+
  
 
== Next Meeting ==
 
== Next Meeting ==
 
The next meeting will be on January 20, 2009
 
The next meeting will be on January 20, 2009

Revision as of 12:20, 6 January 2009

Time

Berlin, Stockholm, Salzburg 6:00:00 PM UTC+1 hours
Helsinki (Finland) 7:00:00 PM UTC+2 hours
London (U.K.) 5:00:00 PM UTC+0 hour
San Francisco (U.S.A. - California) 9:00:00 AM UTC-8 hours
Sao Paulo (Brazil - São Paulo) 3:00:00 PM UTC-2 hours
Moscow (Russian Federation) 8:00:00 PM UTC+3 hours
Seoul 2:00:00 AM UTC+9 hours

Click here for World Clock.

Dial-in Info

Toll free:

  • US: 1877 825 8522
  • UK: 0808 234 7914
  • Brazil: 0800 891 6634
  • Finland: 0800 11 6433
  • Sweden: 020 79 3867 or 020 088 4643
  • Russia: 810800 25281012
  • South Korea: 00308 131627


Other Locales available with toll-free numbers. Please send email to dsdp-tml-dev@eclipse.org to request the list.

International Toll Number: US: +1 702 495 1500

Passcode: 1158163410

Required Attendees

  • Ruth Soliani (Eldorado)
  • Daniel Franco (Eldorado)
  • Otavio Ferranti(Eldorado)
  • Eric Cloninger (Motorola)
  • Fabio Fantato (Eldorado)

Invited Attendees

  • Yufen Kuo (Montavista)
  • You - Everyone with an interest in this project is invited and encouraged to attend the call.

Agenda

  • 0.2 Release
  • Galileo train release
  • EclipseCon 2009 plans

Summary

Release 0.2

  • (FF/EC) Release Review 14-Jan
  • (FF) Update Site/Download site 15-Jan
  • Release Notes + News and Noteworthy
    • (FF) preparing files 9-Jan
    • (FF) uploading files 15-Jan
  • (FF) Ramp Down Policy 0.2 15-Jan
  • Planning 0.2.x releases to be synchronized with internal requirements

Yufen Kuo contribution

  • Integrated into 0.2
  • Wizard was included only in optional SDK package
  • Examples has wizard calls commented.
  • Changes during the integration making the test phase too short to guarantee including this code in 0.2
  • There are a bug to fix samples to 0.2.1 and 0.3

Release 0.3M5

  • (DF) bugfix 246082 28-Jan
  • (DF) bugfix 247179 28-Jan
  • (DF) 257288 IP
    • Verifying dependencies 9-Jan
    • Starting request 16-Jan
      • (FF) get orbit IP approval for /proc
    • Receive Approval until 30-Jan
  • (FF) 257287 Ramp Down Policy
    • Draft 16-Jan
    • Final 30-Jan
  • (TBD) 257292 Leverage OSGI OK, review pending 16-Jan
  • (TBD) 257293 Execution environment OK, review pending 16-Jan
  • (TBD) 257304 Usability 16-Jan
  • (TBD) 257291 Version Numbering OK, review pending 16-Jan
  • (TBD) 257303 Localization - ICU4J OK, review pending 16-Jan
  • (TBD) TW documentation - integrate material produced by TW team - 16-Jan
    • (TBD) 257114 tutorial common package
  • (DF) Black Duck /proc 9-Jan
  • (EC/FF) Start stamp process /proc 13-Jan

Other issues

  • Site review and wiki clean up
  • SVN review
    • On hold to check environment
    • (FF) open a bug against eclipse site to setup a test module in SVN before migration
  • Build scripts
    • (FF) working on Richard's feedback (received in 5-Jan) 9-Jan
    • (TBD) Phase 2 - change hard-coded variables to make nightly build more dynamically and ask to webmaster setup cron table 16-Jan
    • (TBD) Phase 3 - use common build model (new eclipse feature) 23-Jan
  • Live.eclipse.org - M6
    • (TBD) Suggestion-> upload slides and video from eclipsecon2008, need some compilation before it.
  • (TBD) TM integration - 0.4
  • ECF and VNC component - 259524
  • Bugfix scrolling - 259526 - need evaluate and estimate
  • Bugs from internal product integration

Release 0.3M6

  • (FF/EC) estimate next steps and define priorities
  • (TBD) 221740 Implement Linux samples and review existent samples to use the Yufen mechanism.
  • (TBD) 243494 compile to Galileo
  • (TBD) 243500 device proxy
  • (TBD) 243504 GPS reference implementation
  • (TBD) 243508 user guide
  • (TBD) 243509 how to
  • (TBD) 243510 cheat sheets
  • (TBD) 243511 unit tests
  • (TBD) 244249 canvas background
  • (TBD) 255255 adding extension points in /proc
  • new bug to javadoc review

Suggest to postpone

  • (TBD) 243496 top
  • (TBD) 243497 cpuinfo
  • (TBD) 243502 Device Proxy logging/diagnostic
  • (TBD) 243505 log viewer in TPTP
  • (TBD) 247390 validation for properties

EclipseCon 2009

  • Tutorial - 4hs
  • Long Talk - 1h
  • Short Talk - 10 min
  • How many people? Names? How free tickets will be used?

Tutorial Format

  • Introduction (5min)
  • Technical Overview (25 min)
  • VNC hands on (40 min)
  • Device Framework hands on (1h)
  • Break (10 min)
  • /proc FS (30 min)
  • Device Proxy (50h)
  • Q&A (20 min)

V0 --> 26-Jan --> send to Eric review V1 --> 30-Jan --> after review (First submission to site) Eldorado internal dry run and adjustments - 4-Feb Conference call dry run - 6-Feb Final submission - 13-Feb

Next Meeting

The next meeting will be on January 20, 2009

Copyright © Eclipse Foundation, Inc. All Rights Reserved.