Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/TML/Agenda09Feb17"

< DSDP‎ | TML
 
(2 intermediate revisions by the same user not shown)
Line 8: Line 8:
 
* Yufen Kuo (Montavista)
 
* Yufen Kuo (Montavista)
  
== Summary ==
+
== Agenda ==
 +
 
 +
This was a quick call as Eric was away from the office and calling on a cell phone.
 +
 
 +
* Galileo train release is on track.  M6 milestones are in sight.  Should have something to see on Device Proxy before EclipseCon.
 +
* EclipseCon 2009 plans. 
 +
** Tutorial slides are in good shape.  There was a request by the Program Committee to review the tutorials.  Mauren will follow the process and submit items for review. 
 +
** Eldorado attendees have flights and hotel reservations completed.  Eric will complete his this week.  Plan to arrive in SJC on 3/18. 
 +
** Eric preliminary slides for 1 hour talk are at Eldorado for review.  Slides are at 50%, need input on components.
 +
* Mauren Brenner committer status
 +
** Fabio to email Eclipse Foundation to get guidance on this.
  
* M5 milestone
 
** TML completed all M5 activates
 
** There is a build download page and update site operating
 
** Have updated TML website with links
 
** Some delay in the expired certificate for Eclipse platform but it has no effect on TML
 
 
* M6 milestone
 
** Reviewed the M6 milestone requirements. All are currently met, other than the Babel requirement, which we will meet soon.
 
 
* Galileo train
 
** MV having some refresh problems in TML 0.2. Yufen to open a bug and attach screenshots.
 
** Eric and Ruth to discuss offline about MOTODEV releases based on Galileo and TML 0.3
 
** Eric to investigate availability of TWs from Motorola to work on developer and user documentation. Fabio to send Eric a list of topics needing coverage.
 
** Martin Oberhuber informs us there is a update of Apache Commons, but we will use older version until 0.3 ships
 
 
* EclipseCon
 
** Eric to get feedback on slides by EOW
 
** Feb 17 is deadline for slides. Eric will not have his final slides by then.
 
** Tentative plan to arrive in Sunnyvale the Wednesday prior to the show.
 
** Eric and Mauren to do a practice of the slides next Tuesday
 
 
* ECF activities
 
** Need to verify the bugs in bugzilla to see what the scope of this activity involves
 
 
 
== Next Meeting ==
 
== Next Meeting ==
 
The next meeting will be on March 3, 2009
 
The next meeting will be on March 3, 2009

Latest revision as of 12:41, 19 February 2009

Attendees

  • Daniel Franco (Eldorado)
  • Eric Cloninger (Motorola)
  • Fabio Fantato (Eldorado)
  • Mauren Brenner (Eldorado)
  • Ruth Soliani (Eldorado)
  • Yufen Kuo (Montavista)

Agenda

This was a quick call as Eric was away from the office and calling on a cell phone.

  • Galileo train release is on track. M6 milestones are in sight. Should have something to see on Device Proxy before EclipseCon.
  • EclipseCon 2009 plans.
    • Tutorial slides are in good shape. There was a request by the Program Committee to review the tutorials. Mauren will follow the process and submit items for review.
    • Eldorado attendees have flights and hotel reservations completed. Eric will complete his this week. Plan to arrive in SJC on 3/18.
    • Eric preliminary slides for 1 hour talk are at Eldorado for review. Slides are at 50%, need input on components.
  • Mauren Brenner committer status
    • Fabio to email Eclipse Foundation to get guidance on this.

Next Meeting

The next meeting will be on March 3, 2009

Back to the top