Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/TML/Agenda08Oct28"

< DSDP‎ | TML
(Agenda)
 
Line 6: Line 6:
 
* Eric Cloninger (Motorola)
 
* Eric Cloninger (Motorola)
  
== Agenda ==
+
== Summary ==
 
* Discussed EclipseCon 2009 Submissions.  Eric has made 1 submission for a 1 hour overview talk.  Daniel has submitted 1 tutorial and 1 10 minute technical talk.  Everyone listed as a speaker needs to fill in their BIO this week and plan to submit a photo if the talks are accepted.
 
* Discussed EclipseCon 2009 Submissions.  Eric has made 1 submission for a 1 hour overview talk.  Daniel has submitted 1 tutorial and 1 10 minute technical talk.  Everyone listed as a speaker needs to fill in their BIO this week and plan to submit a photo if the talks are accepted.
 
* Discussion of synchronization between TmL 0.1.1 and the various Motorola products.  The release date is still tentatively set for around Nov. 7, 2008.  There are a few bugs that have been opened related to Motorola's latest product adopting TmL, but they seem straight-forward.
 
* Discussion of synchronization between TmL 0.1.1 and the various Motorola products.  The release date is still tentatively set for around Nov. 7, 2008.  There are a few bugs that have been opened related to Motorola's latest product adopting TmL, but they seem straight-forward.

Latest revision as of 13:10, 28 October 2008

Attendees

  • Jefferson Silva (Eldorado)
  • Daniel Franco (Eldorado)
  • Otavio Ferranti(Eldorado)
  • Eric Cloninger (Motorola)

Summary

  • Discussed EclipseCon 2009 Submissions. Eric has made 1 submission for a 1 hour overview talk. Daniel has submitted 1 tutorial and 1 10 minute technical talk. Everyone listed as a speaker needs to fill in their BIO this week and plan to submit a photo if the talks are accepted.
  • Discussion of synchronization between TmL 0.1.1 and the various Motorola products. The release date is still tentatively set for around Nov. 7, 2008. There are a few bugs that have been opened related to Motorola's latest product adopting TmL, but they seem straight-forward.
  • For TmL 0.2, Eric needs to re-engage with Montavista to learn when they need the re-architected code released.
  • No code has been written for TmL 0.3 to go into Galileo, but investigations are on-going.
  • Otavio has integrated the TCF agent with TmL and reports that it is faster than using telnet/ftp. But, there are some technical issues with the way TCF is packaged with TM that we need to investigate before we can standardize on it.

Back to the top