Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/PMC/PMC Minutes 6Dec07"

< DSDP‎ | PMC
Line 22: Line 22:
 
== New Business ==
 
== New Business ==
 
* (Deferred) Introducing the [http://www.eclipse.org/proposals/vpp/ VPP] proposed project and Mark Burton
 
* (Deferred) Introducing the [http://www.eclipse.org/proposals/vpp/ VPP] proposed project and Mark Burton
 +
 
* Introducing RTSC and Dave Russo
 
* Introducing RTSC and Dave Russo
** Some interest from Cisco
+
** Some interest from Cisco – Doug to make an introduction
** Next steps on proposal
+
** Next steps on proposal – Doug to email latest proposal to Mike and Bjorn
  
 
* Stuff Doug needs to do
 
* Stuff Doug needs to do
Line 53: Line 54:
 
* Project Updates
 
* Project Updates
 
** DD
 
** DD
*** Most of the activity is around DSF.  On track for 1.0 in Ganymede.
+
*** Making progress on DSF and GDB/mi - main part of 1.0 code release.
*** The MI reference implementation needs to be evaluated to see if it will fit in CDT 5.0.
+
*** Not getting much from Eclipse Platform in Ganymede.  Mostly patches that we submit.
 +
*** Lots of investment in coordination with CDT.
 
** eRCP
 
** eRCP
*** 1.0.3 maintenance release.
+
*** Finished 1.0.3 maintenance release.  January - another maintenances release: 1.1
*** Working a lot on eRCP standardization.  Will likely have to dual license the Eclipse code, because OSGi doesn't want to provide a specification under EPLWill take this proposal forward at the next Eclipse Board meetingIn December, the Eclipse Board will vote.
+
*** GTK port was contributed.  Nokia is looking at it.
*** GTK runtime contribution. Waiting on IBM legal approval.
+
*** eRCP standardization - licensing is turning out to be difficultOSGi - put the spec until EPL, but label it as an OSGi document, so it has some trademark protection.  So someone can modify it, but it won't be an OSGi spec anymoreSprint will be driving this through OSGiWill be done in January.
 +
*** Android?
 
** MTJ
 
** MTJ
*** Meeting later today.
+
*** Analyzing the existing source code.  There is a lot they intend to maintain going forward.
 +
*** Last couple of weeks have been quiet.
 
** NAB
 
** NAB
*** Added some files to help build NABDoug S has been giving them feedback.
+
*** Plans to get on trainWorking on builds for M4 now.
 
** TM
 
** TM
*** Maintenance and lots of bug fixes for the terminalNext milestone is 2 weeks away.
+
*** TCF contribution is uploaded to bugzilla.  Lots of discussion with ECF lead, Scott Lewis.  Not as much overlap as Scott thought.  TCF is a vertical solution for the embedded spaceECF is a horizontal communication layer.
*** TCF contribution is coming soon.
+
*** Working on integrating terminal with RSE.  Student contribution.  Kevin Doyle.
 +
*** IBM is doing a lot of work as well - bug fixes, API work, unit tests.
 
** TmL
 
** TmL
*** Internal code scan done.  Ready to submit Eclipse CQ.
+
*** Code contributions submitted to CQ.  Doug signed off today after vote last week. Sharon is looking into parallel IP.
*** Working on continuous development approval.
+
*** Should have enough approval for continuous development.
  
 
== Old Business ==
 
== Old Business ==

Revision as of 12:18, 6 December 2007

Time

World Clock

Dial-in Info

  • US: 800-741-0846
  • International: 706-679-9532
  • Passcode: 7817182169#

Invited Attendees

  • Mark Burton (unavailable)
  • Dave Russo
  • Martin Oberhuber
  • Shigeki Moride
  • Christian Kurzke
  • Mark Rogalski
  • Pawel Piech
  • Doug Gaff

New Business

  • (Deferred) Introducing the VPP proposed project and Mark Burton
  • Introducing RTSC and Dave Russo
    • Some interest from Cisco – Doug to make an introduction
    • Next steps on proposal – Doug to email latest proposal to Mike and Bjorn
  • Stuff Doug needs to do
    • Cast PMC vote on TmL CQ's (done)
    • Get MTJ initial committer request in ([Bug:212143])
    • Further explain MTJ reboot
  • EclipseCon submissions
    • Tutorials - 3 slots and 3 good candidates. Pawel's moved to CDT.
    • Long Talks
      • Clear winners - 52, 226, 43
      • Bubble - 213, 314, 274
    • Short Talks
      • All, plus 336
  • Incubation rules
    • DD needs to get in compliance
  • Ganymede release train
    • eRCP - Mark - difficult because they don't have the resources to keep up with milestones.
    • NAB - Shigeki. Hope to get on the train by M4. Don't want to use orbit. #1 test - how much testing do I need to do with other projects? Need to investigate 5,6,13,14,15.
  • Project Updates
    • DD
      • Making progress on DSF and GDB/mi - main part of 1.0 code release.
      • Not getting much from Eclipse Platform in Ganymede. Mostly patches that we submit.
      • Lots of investment in coordination with CDT.
    • eRCP
      • Finished 1.0.3 maintenance release. January - another maintenances release: 1.1
      • GTK port was contributed. Nokia is looking at it.
      • eRCP standardization - licensing is turning out to be difficult. OSGi - put the spec until EPL, but label it as an OSGi document, so it has some trademark protection. So someone can modify it, but it won't be an OSGi spec anymore. Sprint will be driving this through OSGi. Will be done in January.
      • Android?
    • MTJ
      • Analyzing the existing source code. There is a lot they intend to maintain going forward.
      • Last couple of weeks have been quiet.
    • NAB
      • Plans to get on train. Working on builds for M4 now.
    • TM
      • TCF contribution is uploaded to bugzilla. Lots of discussion with ECF lead, Scott Lewis. Not as much overlap as Scott thought. TCF is a vertical solution for the embedded space. ECF is a horizontal communication layer.
      • Working on integrating terminal with RSE. Student contribution. Kevin Doyle.
      • IBM is doing a lot of work as well - bug fixes, API work, unit tests.
    • TmL
      • Code contributions submitted to CQ. Doug signed off today after vote last week. Sharon is looking into parallel IP.
      • Should have enough approval for continuous development.

Old Business

  • General stuff
    • NAB: Feedback comes from WS community, which is why dev list is so quiet. All feedback is in Japanese. Bugzilla can't work because interface is in English, which is a problem. Doug to follow up with Bjorn and Denis
    • DSDP Website - dynamic content
    • eclipse.dsdp Newsgroup - dynamic content
    • DSDP Info center
      • Instructions
      • eRCP, NAB, MTJ?
      • AI: eRCP - work on posting info center docs after 1.0 release

Back to the top