Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "DSDP/DD/Face-to-face Alameda 14-18-May-2007"

< DSDP‎ | DD
(Prerequisites)
(Agenda)
Line 32: Line 32:
 
* Knowledge transfer of the GDB/MI implementation and short discussion about incompatibilities between DSF and the functionality provided by GDB
 
* Knowledge transfer of the GDB/MI implementation and short discussion about incompatibilities between DSF and the functionality provided by GDB
 
* Create a project plan
 
* Create a project plan
* Coding by Ericsson of some functionality (e.g. one MI cmd
+
* Coding by Ericsson of some functionality (e.g. one MI cmd)
 
* Short discussion on DSF improvements to support embedded system profiling
 
* Short discussion on DSF improvements to support embedded system profiling
  

Revision as of 13:57, 22 February 2007

The purpose of this meeting is to continue work on the DSF/GDBmi reference implementation staffed by Ericsson. This meeting will be very technical in nature and will focus on coding rather than presentations. The meeting is open to all, but please see the prerequisites below.

Date

Monday May 14 2007 to Friday May 18 2007

Hotel

Marina Village Inn
1151 Pacific Marina
Alameda, CA 94501
Water Front Room with Queen or King at special rate of 99$. The room has to be booked by phone and you need to specify you are visiting Wind River. This hotel is a short walk from the Alameda campus.
+1 800 345-0304 or +1 510 523-9450
Hotel Link Map

Location

Wind River Corporate Headquarters
500 Wind River Way
Alameda, CA, 94501
Map

Prerequisites

  • Installed on laptop Linux SUSE Enterprise Server 9 or 10
  • Install Java 5, Eclipse 3.3 M5, CDT 4.0 M5, DSF 0.9(head), GDB 6.6 all on Linux SUSE
  • Read all DSF documentation
  • Make the connection work between DSF and GDB
  • Attend the phone conference on March 22 to discuss the above steps
  • Understand the DSF API (reading the code)
  • Attend the phone conference on May 3 to discuss the above steps

Agenda

  • Knowledge transfer of the architecture
  • Knowledge transfer of the GDB/MI implementation and short discussion about incompatibilities between DSF and the functionality provided by GDB
  • Create a project plan
  • Coding by Ericsson of some functionality (e.g. one MI cmd)
  • Short discussion on DSF improvements to support embedded system profiling

Attendees

  • Doug Gaff, Wind River
  • Pawel Piech, Wind River
  • Randy Rohrbach, Wind River
  • Ted Williams, Wind River
  • Veenu Verma, Ericsson (TSP)
  • Francois Chouinard, Ericsson (TSP)
  • Dominique Toupin, Ericsson (R&D PM&T)

Other names will be added as we get confirmation.

Back to the top