Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Cosmos Release Plan"

(Release Themes)
Line 230: Line 230:
 
* finish the SDD tooling for the BTG
 
* finish the SDD tooling for the BTG
 
* have our SDD runtime driver for conformance level 1
 
* have our SDD runtime driver for conformance level 1
 
== Project Designs ==
 
<font color="red">'''<NEEDS TO BE UPDATED>'''</font>
 
 
The COSMOS project is comprised of four projects, managed in a coordinated fashion, across which the plan items are allocated.  COSMOS projects include:
 
 
* '''Data Collection Project''' - The COSMOS Data Collection framework aims to provide value by building a standard based integration framework that can incrementally replace the existing ad hoc integrations between agent infrastructures and the management applications that utilize them. The initial focus of the data collection component is the delivery of a framework that provides a well-defined set of service interface types that facilitate the discovery and control of monitoring agents as well as related data services such as collection, transformation, filtering, persistence, and query. These services may be discovered, explored, and controlled through Web Services Distributed Management (WSDM) standard interfaces. They will describe themselves by exposing Service Modeling Language Interchange Format (SML-IF) models using WS-metadata exchange.
 
* '''Data Visualization Project''' ([https://bugs.eclipse.org/bugs/show_bug.cgi?id=180073 Design Document])- The COSMOS Data Visualization framework aims to provide value by building a standards based integration infrastructure that provides access to two dimensions of the COSMOS management architecture, COSMOS Data Collection and COSMOS Resource Modeling. COSMOS Data Visualization provides a well-defined set of service interface types that facilitate the exploration of the COSMOS Resource Modeling's repository of models and the retrieval of the COSMOS Data Collection's repository of state, event, and performance information. The model repository is semantically linked to the information in the monitor data repository. This relationship, which is managed in Service Modeling Language (SML) through the Resource Modeling component, is used to connect the exploration of the model with data that has been collected.
 
* '''Resource Modeling Project''' -  The COSMOS Resource Modeling sub-project aims to provide support for building a common model to represent the information being shared in a system management scenario. The project is proposing to use Service Modeling Language (SML) as the XML schema language to define this common model. The SML-IF interchange format will be used to share model components between the tools involved in a system management activity. 
 
* '''Management Enablement''' - To be implemented in a future release
 
 
Designs for these projects will be checked in to the COSMOS bugzilla database so that developers can reference them as they create designs for specific plan items.
 
  
 
== Features ==
 
== Features ==
Line 249: Line 237:
 
=== Milestone 1 Objectives (i1 - i3) ===
 
=== Milestone 1 Objectives (i1 - i3) ===
  
[[COSMOS_1.1_Iteration1_Features| v1.1 Iteration 1 Features]]
+
* [[COSMOS_1.1_Iteration1_Features| v1.1 Iteration 1 Features]]
[[COSMOS_1.1_Iteration2_Features| v1.1 Iteration 2 Features]]
+
* [[COSMOS_1.1_Iteration2_Features| v1.1 Iteration 2 Features]]
[[COSMOS_1.1_Iteration3_Features| v1.1 Iteration 3 Features]]
+
* [[COSMOS_1.1_Iteration3_Features| v1.1 Iteration 3 Features]]
  
 
=== GA Objectives (i4 - i5) ===
 
=== GA Objectives (i4 - i5) ===
  
[[COSMOS_1.1_Iteration4_Features| v1.1 Iteration 4 Features]]
+
* [[COSMOS_1.1_Iteration4_Features| v1.1 Iteration 4 Features]]
[[COSMOS_1.1_Iteration5_Features| v1.1 Iteration 5 Features]]
+
* [[COSMOS_1.1_Iteration5_Features| v1.1 Iteration 5 Features]]

Revision as of 09:41, 3 December 2008

COSMOS Wiki > COSMOS Work Items

COSMOS 1.1 Release Plan

Overview

Please send comments about this plan to the cosmos-mgmt@eclipse.org project management mailing list.


This document lays out the feature and API set for the COSMOS releases.

This plan describes the deliverables, milestones, and plan items for the COSMOS project. Each plan item covers a feature or API that is to be added to COSMOS, or some aspect of COSMOS that is to be improved. Each plan item has its own entry in the COSMOS bugzilla database, with a title and a concise summary (usually a single paragraph) that explains the work item at a suitably high level so that everyone can readily understand the work item.


Fixing bugs, improving test coverage, documentation, examples, performance tuning, usability, etc. are considered routine ongoing maintenance activities and are not included in this plan unless they would also involve a significant change to the API or feature set, or involve a significant amount of work. The intent of the plan is to account for all interesting feature work.

Release Deliverables

The following release deliverables are provided:

  • Runtime
  • Tooling
  • Source
  • Examples
  • Component Tests
  • Data Collection Implementation
  • Data Visualization Implementation
  • Resource Modeling Implementation
  • Management Enablement Implementation
  • CMDBf Implementation

Release Milestones

This COSMOS 1.1 is targeted for general availability on 26-June-2009. All deliverables will be available for download as soon as the release has been tested and validated in the target configurations. There is an allocation of resource to defect removal in all iterations. The first Iterations 1-2 will contain the bulk of the enhancement work, with Iteration 3 stabilizing the milestone driver, with Iteration 4 finishing the enhancement work, and Iteration 5 will mainly be used to stabilize and shut down the release.


Release Milestones

MilestoneDuration Planned Start Date Planned End Date Actual Start Date Actual End Date Description Comments
Iteration 18 weeks Nov-17-2009 Jan-09-2009 Enhancements
i1 Development 5 weeks Nov-17-2009 Dec-19-2009 Development & bug fixes
i1 Testing 3 weeks Dec-22-2009 Jan-09-2009 Validation Testing
Iteration 26 weeks Jan-12-2009 Feb-20-2009 Enhancements
i2 Development 4 weeks Jan-12-2009 Feb-06-2009 Development & bug fixes
i2 Testing 2 weeks Feb-09-2009 Feb-20-2009 Validation Testing
Iteration 36 weeks Feb-23-3009 Apr-03-2009 Stabilize
i3 Development 4 weeks Feb-23-2009 Mar-20-2009 Development & bug fixes
i3 Testing 2 weeks Mar-23-2009 Apr-03-2009 Validation Testing
Milestone driver1 day Apr-03-2009 Apr-03-2009 Available for POCs
Iteration 46 weeks Apr-06-2009 May-15-2009 Enhancements
i4 Development 4 weeks Apr-06-2009 May-01-2009 Development & bug fixes
i4 Testing 2 weeks May-04-2009 May-15-2009 Validation Testing
Iteration 56 weeks May-18-2009 June-26-2009 Stabilize
i5 Development 4 weeks May-18-2009 June-12-2009 Development & bug fixes
i5 Testing 2 weeks June-15-2009 June-26-2009 Validation Testing
COSMOS 1.1 availability1 day June-26-2009 June-26-2009 GA Release

Major deliverables

  • SML bug fixes
  • reconciliation taxonomy
  • finish the SDD tooling for the BTG
  • have our SDD runtime driver for conformance level 1

Features

Plan items targeted for this release represent the addition of new features or areas where existing features will be significantly reworked or enhanced. Plan items are allocated to the projects indicated above.

Milestone 1 Objectives (i1 - i3)

GA Objectives (i4 - i5)

Back to the top