Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Cosmos Architecture Meeting 24-September-08"

(Data Reporting)
(Data Reporting)
Line 29: Line 29:
 
==Data Reporting==
 
==Data Reporting==
  
* No enhancements outstanding for i13
+
* 1 enhancements outstanding for i14
 +
** 229800 Provide DOJO simple method descriptions for services available in COSMOS
 +
 
 +
Defer to Future
 +
 
 
* 2 bugs deferred from i13  
 
* 2 bugs deferred from i13  
 
** 247004 CMDB Graph Response Report : hardcoded path for report.jsp file.  
 
** 247004 CMDB Graph Response Report : hardcoded path for report.jsp file.  

Revision as of 11:51, 29 September 2008

These are the minutes for the Architecture Meeting for 24 September 2008.

Attendees

  • Paul (minutes)
  • Srinivas
  • Naveen
  • Ramesh
  • Leonard
  • Jimmy
  • Jack

Agenda

  • Data Reporting
    • ERs i14
    • Bugs i14
  • Data Collection
    • ERs i14
    • Bugs i14
  • Architecture (All Components)
    • [1] i14 Bugs
    • Update i14 plan and status
  • Around the room

Minutes

Data Reporting

  • 1 enhancements outstanding for i14
    • 229800 Provide DOJO simple method descriptions for services available in COSMOS

Defer to Future

  • 2 bugs deferred from i13
    • 247004 CMDB Graph Response Report : hardcoded path for report.jsp file.
    • 247149 CMDB Graph Response Report : Problem with SMLMDR Relationship report data.

Low priority for i14.

Data Collection

  • No Enhancements outstanding for i13
  • 1 bug outstanding
    • 228266 - Raised by Saurabh concerning running JUNITS after build cycle. Agreed to move to i14. Saurabh to update.


Architecture

  • All agreed to recommend i13 closed to Community call.
  • Reviewed list of ER's Open against i13 or no specified milestone (all components)
  • i14 ER candidates will be reviewed over the next few weeks by component leads.
  • i13 status matrix has been updated to reflect current status


QA Tools

  • CA QA group have developed a testing framework for MDR's generated by COSMOS.
  • Jean-Pierre presented slides to show composition and operation of tool.
  • All agreed that the tool would provide a benefit to COSMOS adopters.
  • Craig will respond to several area's that the group raised for possible inclusion to the codeline in the unspecified future.

Back to the top