Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Cosmos Architecture Meeting 02-Jan-08"

(Verify bugzillas for i8)
(Minutes)
Line 35: Line 35:
  
  
On Friday's (4-Jan-08) summit meeting we need to define the end-to-end testing for i8.
 
  
 
== Define holistic (i.e. integration / system / et al) testing requirements for i9 [ Jimmy Mohsin ] ==
 
== Define holistic (i.e. integration / system / et al) testing requirements for i9 [ Jimmy Mohsin ] ==
 +
 +
 +
On Friday's (4-Jan-08) summit meeting we need to define the end-to-end testing for i8.  We felt that at the end of i7, we had a bit of a "fire drill" to identify what we needed to do to validate the end-to-end.  We want to avoid this for i8.
  
  
  
 
== Establish testing expectations for i8 [ Jimmy Mohsin ] ==
 
== Establish testing expectations for i8 [ Jimmy Mohsin ] ==

Revision as of 11:43, 2 January 2008

Attendees

  • Valentina Popescu
  • Martin Simmonds
  • Paul Stratton
  • Hubert Leung
  • Bill Muldoon
  • John Todd
  • Don Ebright
  • Joel Hawkins
  • Leonrd Richardson
  • Tania Makins
  • Sheldon Leeloy
  • Ali Mehregani
  • Shivvy
  • David Whiteman
  • Jimmy Mohsin

Minutes

Verify bugzillas for i8

https://bugs.eclipse.org/bugs/buglist.cgi?short_desc_type=allwordssubstr&short_desc=&product=Cosmos&target_milestone=1.0i8&long_desc_type=allwordssubstr&long_desc=&bug_status=RESOLVED&resolution=FIXED&order=Importance

  • For enhancements, the QA Team should be responsible for verifying the enhancement according to the use case.
  • For bugs, the originator should verify the bug.


According to our defined development process, the exit criteria for the iteration is that all defects and enhancements are closed or otherwise addressed, e.g. moved into the next iteration. We want to go into the next iteration with a clean slate of bugzilla.


We would like to have the test cases run automatically as part of the build, but this is not currently setup.


We would like to verify the bugs as part of the test pass.


Define holistic (i.e. integration / system / et al) testing requirements for i9 [ Jimmy Mohsin ]

On Friday's (4-Jan-08) summit meeting we need to define the end-to-end testing for i8. We felt that at the end of i7, we had a bit of a "fire drill" to identify what we needed to do to validate the end-to-end. We want to avoid this for i8.


Establish testing expectations for i8 [ Jimmy Mohsin ]

Back to the top