Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Category:Eclipse Platform Releng Meetings"

Line 1: Line 1:
 
Meetings for Platform Release Engineering. These are intended to be short, very focused meetings, concerned with narrow range of topic, such as making 4.2 primary build, building and testing the platform on build.eclipse.org, and similar. Many issues can be solved via IRC or bugzilla, but best to have a phone meeting scheduled to help make sure we (or, at least me, myself :) stay on track.  
 
Meetings for Platform Release Engineering. These are intended to be short, very focused meetings, concerned with narrow range of topic, such as making 4.2 primary build, building and testing the platform on build.eclipse.org, and similar. Many issues can be solved via IRC or bugzilla, but best to have a phone meeting scheduled to help make sure we (or, at least me, myself :) stay on track.  
 +
 +
These are scheduled ever Tuesday, 2 PM to 2:30 PM, until June 5th, and hopefully we won't need them that long!
 +
 +
The call-in number is
 +
  888-426-6840  Participant Code: 6460142
  
  

Revision as of 11:36, 8 April 2012

Meetings for Platform Release Engineering. These are intended to be short, very focused meetings, concerned with narrow range of topic, such as making 4.2 primary build, building and testing the platform on build.eclipse.org, and similar. Many issues can be solved via IRC or bugzilla, but best to have a phone meeting scheduled to help make sure we (or, at least me, myself :) stay on track.

These are scheduled ever Tuesday, 2 PM to 2:30 PM, until June 5th, and hopefully we won't need them that long!

The call-in number is

 888-426-6840  Participant Code: 6460142

Back to the top