Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "Category:Eclipse Platform Releng Meetings"

(Not being done for 8 years only complicates the main page.)
 
(5 intermediate revisions by one other user not shown)
Line 1: Line 1:
Meetings for Platform Release Engineering. These are intended to be short, very focused meetings, concerned with narrow range of topic, such as making 4.2 primary build, building and testing the platform on build.eclipse.org, and similar. Many issues can be solved via IRC or bugzilla, but best to have a phone meeting scheduled to help make sure we (or, at least me, myself :) stay on track.  
+
Meetings for Platform Release Engineering.
  
 +
The regularly occurring meeting have been discontinued since they were so successful (and everything transitioned quickly).
  
 
+
Please use IRC, bugzilla, or mailing lists for issues ... or, request a meeting if we need one.
 
+
 
+
 
+
 
+
 
+
 
+
[[Category:Eclipse_Platform_Releng| ]]
+

Latest revision as of 03:57, 27 November 2020

Meetings for Platform Release Engineering.

The regularly occurring meeting have been discontinued since they were so successful (and everything transitioned quickly).

Please use IRC, bugzilla, or mailing lists for issues ... or, request a meeting if we need one.

Back to the top