=== Data Visualization (Sheldon Lee-Loy)===
 
=== Data Visualization (Sheldon Lee-Loy)===
 +
 +
i14 Week2 status (Srinivas)
 +
* org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Component.Widget = 100%
 +
* org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Reports = 100%
  
 
=== Resource Modeling (David Whiteman) ===
 
=== Resource Modeling (David Whiteman) ===

Latest revision as of 07:49, 1 October 2008

COSMOS weekly status

QA status (Srinivas Reddy Doma)

  • 14 Week2 QA status
    • No issues found.

RE/Build team status (Saurabh Dravid)

Web/Documentation (Rich Vasconi)

Testing Status of COSMOS Candidate Driver COSMOS-1.0.0-200809301142

Team, after you have updated your status on this page, send an email to Saurabh Dravid(sadravid at in.ibm.com) so that he can track when all of the status is posted and ready. To reduce noise on the mailing list, report to cosmos-dev only if you find a problem that other people need to know about and react to. Saurabh will post an email stating when the driver has passed all tests.

Link to the integration driver

Data Collection (Jimmy Mohsin)

cmdbf.services.tests

Data Visualization (Sheldon Lee-Loy)

i14 Week2 status (Srinivas)

  • org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Component.Widget = 100%
  • org.eclipse.cosmos.examples.e2e.tests/DataVisualization.UI.Reports = 100%

Resource Modeling (David Whiteman)

  • validation.tests
  • repository.tests
  • smlif.tests

Management Enablement (Jason Losh)

dmtoolkit.tests

Bugzilla status

Status to be filled in by:

  • Data Collection bugzilla status (Jimmy Mohsin)
  • Data Visualization bugzilla status (Sheldon Lee-Loy)
  • Resource Modeling bugzilla status (David Whiteman)
  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Saurabh Dravid)
  • QA bugzilla status (Srinivas Reddy Doma)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Not started

Enter the status on the i14 plan and status

Back to the top