Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS SDD Minutes 08MAY08"

(Forgot part of the agenda)
(Undo revision 102348 by Merri.Jensen.sas.com (Talk))
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
 
== Logistics ==
 
== Logistics ==
* Date: 03JUN08
+
* Date: 08MAY08
* Time: 11AM EST
+
* Time: 4PM EST
* Attendees: Chris Mildebrandt, Charlie Halloran, David Whiteman, Paul Stratton, Mark McCraw, Merri Jensen, Josh Hester, Eric Rose, Jeff Hamm, Robert DeMason
+
* Attendees: Chris Mildebrandt, Mark McCraw, Merri Jensen, Josh Hester, Jason Losh, Eric Rose, Jeff Hamm, Robert DeMason, Charles Nemargut
  
 
== Agenda ==
 
== Agenda ==
  
# i11 status updates
+
# i11 work items for SDD
#* This should be in prep for the community call meeting on Wednesday morning.  The following page will be reviewed http://wiki.eclipse.org/COSMOS/COSMOS_i11_week5_weeklycandidate  Note that the week5 page has not been created as of the time the agenda was created (5/30). It will be created prior to the ME meeting on 6/3.
+
#* http://wiki.eclipse.org/COSMOS/COSMOS_iteration_i11_plan
 +
#* SDD bug list https://bugs.eclipse.org/bugs/buglist.cgi?query_format=specific&order=relevance+desc&bug_status=__open__&product=Cosmos&content=SDD
 +
# Update from Eric/Yan/Chris/Josh/Robert on tools work
 +
# Status of zip extractor contribution
 +
# Status of tool code contribution
 +
# Status of change analyzer code contribution
 +
# Runtime design discussion
 
# Follow-up on action items
 
# Follow-up on action items
#* My update is that I'm continuing to refine the SDD for COSMOS. Also, I was about to commit the SAS source code but noted an Eclipse process related to internal/provisional APIs that I did not expect. Mark M. and I have been reviewing and think all of our APIs should be provisional at this point.  This will cause some refactor in package names.
+
#* Charlie/Chris/Eric, continue working w/ IBM legal on committing BTG code & Change Analyzer code, Charlie to send status.
#Runtime architecture discussion based on Julia's feedback
+
#* Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
#* [[Media:Comments_on_COSMOS_SDD_Runtime_Architecture.zip]]
+
#* Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code).
 
+
#* Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
Time permitting … alignment/integration topics
+
#* Julia to work with Jeff and Mark M. to create CL1 SDD for COSMOS and work with Chris to run it through the Change Analyzer.
 
+
#* Mark M. and Jeff to continue working on code for zip extraction.
#P2/SDD runtime alignment
+
#* Chris to update package names for Change Analyzer before code is committed.
#*Charlie to provide an update on scheduling a meeting to discuss P2/SDD again
+
#* Charlie to find someone to update the Change Analyzer code to remove the dependency on Tuscany and replace it with DOM.
#SML/CML/SDD/OVF alignment
+
#* Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
#*Pending discussion between Mark W. and Jason.  No update yet.
+
#* Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
#CMDBf integration
+
#*Tee this as a future discussion item as well.  May not be covered in this call.
+
  
  
 
== Minutes ==
 
== Minutes ==
  
 
+
# I was late getting on the call, so Jason will have to fill in where I'm missing info.
 +
# Drools approval pending, Eric to work out, with an Eclipse mentor's help.
 +
# Using the parallel IP process, Josh can go ahead and get Jason to the code to commit while Drools is being worked out.
 +
# Jason hopes to have zip extractor code committed by next week's call.
 +
# Target for IBM code push - 06/04, all code has to go in at the same time including Change Analyzer.
 +
#* Contigent upon Mark W. hearing back from Eclipse on whether code can go in as is and be updated in the public.
 +
# Use Case Doc going into wiki rather than as a code contribution.  Charlie still needs a VP to approve, but he doesn't think it will be a problem.
 +
#* Jason is waiting to move the deployment use cases over into main COSMOS doc until he can see the IBM Use Cases.
 +
# Remaining discussion is on the initial SDD for COSMOS that was created by Mark M., Jeff, and Julia.
  
 
== Action Items ==
 
== Action Items ==
  
# Jason to commit SAS zip extractor code, Mark to change packages to align with COSMOS requirements.
+
# Charlie/Chris/Eric, commit code when legal issues are worked out with Eclipse.
 +
# Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
 +
# Jason to commit SAS zip extractor code.
 +
# Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code) and about in place replacement of Tuscany.
 +
# Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
 
# Continue work on SDD for COSMOS.
 
# Continue work on SDD for COSMOS.
 +
# Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
 
# Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
 
# Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
# Charlie to schedule meeting with P2 folks.
+
# Charlie to get VP approval for Use Cases and put them on a wiki.
# SDD User Guide?
+
# Schedule meetings to discuss Runtime design document that is being worked on and circulated.
# Discuss Runtime discussion.
+

Latest revision as of 15:03, 5 June 2008

Logistics

  • Date: 08MAY08
  • Time: 4PM EST
  • Attendees: Chris Mildebrandt, Mark McCraw, Merri Jensen, Josh Hester, Jason Losh, Eric Rose, Jeff Hamm, Robert DeMason, Charles Nemargut

Agenda

  1. i11 work items for SDD
  2. Update from Eric/Yan/Chris/Josh/Robert on tools work
  3. Status of zip extractor contribution
  4. Status of tool code contribution
  5. Status of change analyzer code contribution
  6. Runtime design discussion
  7. Follow-up on action items
    • Charlie/Chris/Eric, continue working w/ IBM legal on committing BTG code & Change Analyzer code, Charlie to send status.
    • Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
    • Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code).
    • Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
    • Julia to work with Jeff and Mark M. to create CL1 SDD for COSMOS and work with Chris to run it through the Change Analyzer.
    • Mark M. and Jeff to continue working on code for zip extraction.
    • Chris to update package names for Change Analyzer before code is committed.
    • Charlie to find someone to update the Change Analyzer code to remove the dependency on Tuscany and replace it with DOM.
    • Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
    • Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).


Minutes

  1. I was late getting on the call, so Jason will have to fill in where I'm missing info.
  2. Drools approval pending, Eric to work out, with an Eclipse mentor's help.
  3. Using the parallel IP process, Josh can go ahead and get Jason to the code to commit while Drools is being worked out.
  4. Jason hopes to have zip extractor code committed by next week's call.
  5. Target for IBM code push - 06/04, all code has to go in at the same time including Change Analyzer.
    • Contigent upon Mark W. hearing back from Eclipse on whether code can go in as is and be updated in the public.
  6. Use Case Doc going into wiki rather than as a code contribution. Charlie still needs a VP to approve, but he doesn't think it will be a problem.
    • Jason is waiting to move the deployment use cases over into main COSMOS doc until he can see the IBM Use Cases.
  7. Remaining discussion is on the initial SDD for COSMOS that was created by Mark M., Jeff, and Julia.

Action Items

  1. Charlie/Chris/Eric, commit code when legal issues are worked out with Eclipse.
  2. Jason to commit SAS SDD Tooling code simultaneous with IBM SDD Tooling.
  3. Jason to commit SAS zip extractor code.
  4. Mark W to contact Eclipse about adding SDD Tooling code (since contributions are over 200 lines of code) and about in place replacement of Tuscany.
  5. Jason to start moving use cases and "details" into COSMOS Use Cases and begin entering i11 enhancement requests.
  6. Continue work on SDD for COSMOS.
  7. Josh to determine the exact number of lines that SAS has for BTG code since it is close to 250.
  8. Jason to start documenting the Runtime similar to doc Chris has created for SDD Tooling (need URL).
  9. Charlie to get VP approval for Use Cases and put them on a wiki.
  10. Schedule meetings to discuss Runtime design document that is being worked on and circulated.

Back to the top