Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Minutes of prior meetings)
Line 37: Line 37:
 
== Misc Documents ==
 
== Misc Documents ==
 
*[[P2 Install Example]]
 
*[[P2 Install Example]]
 +
 +
== Agenda (10/07/08) ==
 +
 +
Discuss defects for COSMOS 1.0 inclusion:
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249652 249652] - SPI outputs incorrect date format for lastModified attribute
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249655 249655] - SPI: descriptorID getter/setter should return/take a byte[] instead of String
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249349 249349] - SDD Validator JUnits use incorrect Schematron location
 +
* [https://bugs.eclipse.org/bugs/show_bug.cgi?id=249714 249714] - SPI: createAdditionalContent() creates element with incorrect attribute name
  
 
== Agenda (9/30/08) ==
 
== Agenda (9/30/08) ==

Revision as of 12:41, 6 October 2008

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-888-682-4285
Primary International Dial-in: + 1-973-368-0695 (Requires International prefix first)
SAS Employees: x40000
Conference Code: 3358100246

Contact

Email [Jason Losh]


Working Design Documents

Misc Documents

Agenda (10/07/08)

Discuss defects for COSMOS 1.0 inclusion:

  • 249652 - SPI outputs incorrect date format for lastModified attribute
  • 249655 - SPI: descriptorID getter/setter should return/take a byte[] instead of String
  • 249349 - SDD Validator JUnits use incorrect Schematron location
  • 249714 - SPI: createAdditionalContent() creates element with incorrect attribute name

Agenda (9/30/08)

  1. Administrative
  2. Countdown to COSMOS 1.0
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver progress (Jeff)

Agenda (9/16/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • ERs identified for i14
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver design (Jeff)
  5. SML discussion

Agenda (9/9/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
    • Update on SAS participation
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • Scoping for i14
    • BTG status (Josh/Robert)
      • TPTP tests
    • Change analyzer update (Merri)
  4. Runtime update (Jeff)
    • Change resolver design




Minutes of prior meetings

Back to the top