Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS Management Enablement"

(Agenda (10/21/08))
(Added new link and updated with next week's agenda)
Line 37: Line 37:
 
== Misc Documents ==
 
== Misc Documents ==
 
*[[P2 Install Example]]
 
*[[P2 Install Example]]
 +
 +
== Agenda (10/28/08) ==
 +
 +
* SDD tools building and included in the download - be sure what is expected is there
 +
* Discuss for inclusion in COSMOS 1.0:
 +
** [https://bugs.eclipse.org/bugs/show_bug.cgi?id=240065 240065] - Document APIs for SDD Programmatic Interface
 +
* Status on Tuscany replacement with JAXB
 +
** [http://wiki.eclipse.org/COSMOS_ME_Minutes_23OCT08_Change_Analyzer_Status Change Analyzer Status Call]
 +
** Ready to move code into Eclipse Repo, how do we want to go about this?
 +
* Change resolver status update
 +
* P2 integration update
 +
* Growing the community
  
 
== Agenda (10/21/08) ==
 
== Agenda (10/21/08) ==
Line 116: Line 128:
  
 
== Minutes of prior meetings ==
 
== Minutes of prior meetings ==
 +
* [[COSMOS_ME_Minutes_23OCT08_Change_Analyzer_Status|October 23, 2008 Change Analyzer Status Update Call]]
 
* [[COSMOS_ME_Minutes_30SEP08|September 30, 2008]]
 
* [[COSMOS_ME_Minutes_30SEP08|September 30, 2008]]
 
* [[COSMOS_ME_Minutes_09SEP08|September 9, 2008]]
 
* [[COSMOS_ME_Minutes_09SEP08|September 9, 2008]]

Revision as of 15:48, 23 October 2008

COSMOS Main Page


Management Enablement

Meeting Title: COSMOS Management Enablement Weekly Meeting
Link to information on Wiki:
Date & Time: Tuesday at 11:00 EDT / 11:00am EDT
Toll-free Dial-in number: 1-888-682-4285
Primary International Dial-in: + 1-973-368-0695 (Requires International prefix first)
SAS Employees: x40000
Conference Code: 3358100246

Contact

Email [Jason Losh]


Working Design Documents

Misc Documents

Agenda (10/28/08)

  • SDD tools building and included in the download - be sure what is expected is there
  • Discuss for inclusion in COSMOS 1.0:
    • 240065 - Document APIs for SDD Programmatic Interface
  • Status on Tuscany replacement with JAXB
  • Change resolver status update
  • P2 integration update
  • Growing the community

Agenda (10/21/08)

  • SDD tools building and included in the download - be sure what is expected is there
  • Discuss for inclusion in COSMOS 1.0:
    • 240065 - Document APIs for SDD Programmatic Interface
  • Status on Tuscany replacement with JAXB
    1. We are good to go with using JAXB - need to know version so it can be declared as a dependency in Orbit
    2. We will not change the Java requirement for COSMOS 1.0+
  • Change resolver status update
  • P2 integration update
  • Growing the community

Agenda (10/07/08)

From Eric - Discuss defects for COSMOS 1.0 inclusion:

  • 249652 - SPI outputs incorrect date format for lastModified attribute
  • 249655 - SPI: descriptorID getter/setter should return/take a byte[] instead of String
  • 249349 - SDD Validator JUnits use incorrect Schematron location
  • 249714 - SPI: createAdditionalContent() creates element with incorrect attribute name
  • 249873 - SDD Validator: Schematron validation is non-functional
  • Schema checkin status
  • TPTP test checkin status
  • Bugzilla cleanup.
  • Documentation updates for SDD tooling
  • SDD tooling build updates
    1. Saurahb reported a problem building SPI, Validator, and Change Analyzer -- have these been resolved?
  • JAXB implementation for Change Analyzer - requires IPzilla approval from Eclipse Legal OR COSMOS 1.1/2.0 to require JRE/JDK 1.6
  • Change resolver status update

Agenda (9/30/08)

  1. Administrative
  2. Countdown to COSMOS 1.0
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver progress (Jeff)

Agenda (9/16/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • ERs identified for i14
    • BTG/rules status (Josh/Robert)
    • Change analyzer update (Merri/Mark/Brad/Jeff)
  4. Runtime update (Jeff/Jason)
    • Change resolver design (Jeff)
  5. SML discussion

Agenda (9/9/08)

  1. Administrative
    • Welcome Lazar (SAP) to the team
    • Update on SAS participation
  2. i13 testing status
  3. Tooling update (Eric/Chris/Yan/Josh/Robert)
    • Scoping for i14
    • BTG status (Josh/Robert)
      • TPTP tests
    • Change analyzer update (Merri)
  4. Runtime update (Jeff)
    • Change resolver design




Minutes of prior meetings

Copyright © Eclipse Foundation, Inc. All Rights Reserved.