Difference between revisions of "COSMOS CountdownTo1.0"

(Must do for 1.0)
(Must do for 1.0)
Line 203: Line 203:
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
<td>Finish the release review slides [http://wiki.eclipse.org/Image:COSMOS_1.0_Release_Review_20080919_dlw.zip david's review]</td>
+
<td>Finish the release review slides <br/><font color="red" size="+1">Please put your release review updates here</font>
 +
<ul>
 +
<li>[http://wiki.eclipse.org/Image:COSMOS_1.0_Release_Review_20080919_dlw.zip david's review]</li>
 +
<li>Jimmy's review</li>
 +
<li>Mark's review</li>
 +
<li>Martin's review</li>
 +
<li>Jason's review</li>
 +
<li>Ruth's review</li>
 +
</td>
 
<td></td>
 
<td></td>
 
<td>Project Leads, Architecture Lead, Ruth Lee</td>
 
<td>Project Leads, Architecture Lead, Ruth Lee</td>

Revision as of 17:01, 19 September 2008

Countdown schedule

  • Starting in i14, we will track weekly status on the Countdown page
    • by Sept 12, any inactive committers will resign their committer status
    • by Sept 12, Ruth to find new mentors for COSMOS (not sure how realistic this is, but let's start with this date)
    • by Sept 26, Ruth to schedule the release review for COSMOS with the Eclipse EMO. Ask for Oct 10.
    • by Oct 10, everyone to try and resolve any Eclipse Legal outstanding items for DOJO and log4j and axis2
    • by Oct 10, attend the release review to request permission to release COSMOS 1.0 and to graduate COSMOS into a mature project

Technical, documentation, legal, and release review items remaining

Doc ownership

  • Jimmy to own User Guide
  • Paul to own Install Guide
  • David and Jack to own the Developer Guide
  • Javadoc still needs to be written but that's in the code itself and is owned by development


Sizing legend and Status column

Sizing legend:

  • Low - takes 1-3 days
  • Medium - takes a week
  • High - takes more than a week

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Defer (no longer a priority for COSMOS 1.0)
  • Not started


Must do for 1.0

Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing
Release Review 215609 Normal Maintain documentation of third party dependencies Ruth Lee Low
Release Review bugzilla 229078 Normal about.html and other legal notices to be added to the build Ruth Lee High
Build bugzilla 242766 Normal Axis2 zip file Saurabh Dravid
Build bugzilla 246855 Normal DOJO zip file Saurabh Dravid
Build N/A Normal Split CVS into COSMOS 1.0 and COSMOS post-1.0 stream Saurabh Dravid
ME bugzilla 246868 Normal Update MDR toolkit in response to 246855 David Whiteman
Doc bugzilla 216210 Normal Define & document COSMOS 1.0 hardware & software operational guidelines, recommendations, and best practices Jimmy Mohsin
Doc bugzilla 240382 Normal Update install guide for new version of Dojo Paul Stratton
Doc bugzilla 218825 Normal COSMOS User's Guide development David Whiteman and Jack Devine
COMPLETE DV bugzilla 245568 Normal Cannot open staff query folder Martin Simmonds
Doc Update User Guide and Developer Guide with changes due to changed code and package names, or any other updates required Jimmy Mohsin
Doc Add missing sections to User Guide Jimmy Mohsin
Doc Add missing sections to Developer Guide David Whiteman and Jack Devine
Doc Release notes need to be created for known critical issues Pam Kusnirik
COMPLETE ME bugzilla 247658 MDR Toolkit : Problem with DataManager Name David Whiteman
Release Review Finish the release review slides
Please put your release review updates here
  • david's review
  • Jimmy's review
  • Mark's review
  • Martin's review
  • Jason's review
  • Ruth's review
  • </td>

</td> Project Leads, Architecture Lead, Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Schedule a meeting with Bjorn to inform him of updates (cancel

0.9, staffing) and ask what are his recommendations given that we had to cancel 0.9 due to legal clearance issues. Can we run through a practice run with the Eclipse board (or maybe even just Bjorn and new mentor) before going for the Big 1.0 Review? Also ask Bjorn how the review works; i.e., Anne reviews the slides & tells if there's a big problem, team presents to the board and has the five weeks to correct before GA?</td>

</td> Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Find two new mentors for COSMOS</td> </td> Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Schedule a meeting with the two new mentors</td> </td> Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Book the review itself with EMO</td> </td> Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Send project IP Log to Eclipse Legal</td> </td> Ruth Lee</td> </td>

</tr>

</td> Release Review</td> </td> </td> Cancel any bugzillas that we will not complete by COSMOS 1.0 or the

first release after COSMOS 1.0. (This is to cull the list of any "noise" (abandoned bugzillas). If someone wants to reopen it then fine. We should put the list of bugzillas on this page.)

  • WSDM, OSGi, CBE, and other deprecated code to be wontfix
  • everything else that cannot be contained in 1.0 to be future
  • use i14 for anything not committed to 1.0 but in consideration for 1.0. Should also be in the bugzilla list on this page.

</td>

</td> Project Leads</td> </td>

</tr>

</td> Release Review</td> </td> </td> Clean up the committer list of any inactive committers (need to check

with Bjorn to see what he thinks about retaining committer status for the IBMers who may be back in 2009)</td>

</td> Mark Weitzel and Ruth Lee</td> </td>

</tr> </table>

Recommended for 1.0 but can be dropped if necessary

Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing
bugzilla 220594 Release readiness: contextual help David Whiteman

SML: In Research items

COSMOS 1.0 will contain an SML-IF document editor and utilities to validate SML-IF documents. The SML code will not have cleared the Eclipse Legal process required to validate the IP cleanliness of external dependencies, e.g. XSD files, by the 1.0 release and therefore, will be given the designation "In Research". The implication of this is that this portion of the code will not be forced to comply with the release readiness requirements of COSMOS.

  • IPZilla review for SML schema and SML-IF schema files 2240 (awaiting analysis - checkin due to parallel IP)
  • IPZilla review for Schematron skeleton 2584 (awaiting analysis - checkin due to parallel IP)
  • documentation will not be guaranteed to be complete by 1.0

SDD: In Research items

The COSMOS 1.0 deliverable will be a validation utility for SDD documents and a corresponding programmatic interface. The SDD code will not have cleared the Eclipse Legal process by the 1.0 release and therefore, will be given the designation "In Research". The implication of this is that this portion of the code will not be forced to comply with the release readiness requirements of COSMOS.

  • IPZilla review for SDD Change Analyzer 2316 (awaiting committer)
  • IPZilla review for Schematron skeleton 2472 (awaiting analysis)
  • IPZilla review for Schematron text implementation 2473 (awaiting analysis)

Resources

Completed

  • bugzilla 215135 Run BVT
  • reassign any ownership in bugzilla to the new component owner
  • IPZilla review for DOJO 2026
  • IPZilla review for Log4J 2309