Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.
Difference between revisions of "COSMOS 1.1 Iteration7 Features"
(New page: = COSMOS v1.1 iteration 7 plan = == Schedule for Iteration 7 == Schedule for Iteration 7 ==Design doc every enhancement== * if the enhancement is reall...) |
(→Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc)) |
||
Line 51: | Line 51: | ||
! Design Doc | ! Design Doc | ||
! Use Case | ! Use Case | ||
+ | |- | ||
+ | | Medium | ||
+ | | '''COMPLETE''' | ||
+ | | Management Enablement | ||
+ | | [https://bugs.eclipse.org/bugs/show_bug.cgi?id=281282 281282] | ||
+ | | Enhancement | ||
+ | | Resolve ResourcePropertyType variables | ||
+ | | N/A | ||
+ | | Jeff Hamm | ||
+ | | Medium | ||
+ | | | ||
+ | |- | ||
+ | | High | ||
+ | | Not Started | ||
+ | | Management Enablement | ||
+ | | [https://bugs.eclipse.org/bugs/show_bug.cgi?id=281288 281288] | ||
+ | | Enhancement | ||
+ | | Decompose operation handler into discreet operations | ||
+ | | N/A | ||
+ | | Josh Hester | ||
+ | | High | ||
+ | | Needed | ||
+ | | Needed | ||
+ | |- | ||
+ | | Medium | ||
+ | | '''COMPLETE''' | ||
+ | | Management Enablement | ||
+ | | [https://bugs.eclipse.org/bugs/show_bug.cgi?id=282024 282024] | ||
+ | | Enhancement | ||
+ | | Need to honor priority attribute for AlternateTypes and ConstraintTypes | ||
+ | | N/A | ||
+ | | Jeff Hamm | ||
+ | | Medium | ||
+ | | N/A | ||
+ | | N/A | ||
|- | |- | ||
| | | |
Latest revision as of 14:21, 11 August 2009
Contents
COSMOS v1.1 iteration 7 plan
Schedule for Iteration 7
Design doc every enhancement
- if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
- if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.1.
Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc)
Sizing legend:
- Low - takes 1-3 days
- Medium - takes a week
- High - takes more than a week
Status to be filled in by:
- Data Collection bugzilla status (Jimmy Mohsin)
- Data Visualization bugzilla status (Jimmy Mohsin)
- Resource Modeling bugzilla status (David Whiteman)
- Management Enablement bugzilla status (Jason Losh)
- RE/Build bugzilla status (Saurabh Dravid)
- QA bugzilla status (No owner)
- Doc bugzilla status (No owner)
- Legal & release review prep and status (Jason Losh)
The Status column can have one of these values:
- COMPLETE
- On track
- At risk
- Not containable
- Defer (no longer a priority for this iteration)
- Not started
Priority | Status | Project or subteam | Enhancement | Severity | Description | Blocked by (if applicable) | Owner | Sizing | Design Doc | Use Case |
---|---|---|---|---|---|---|---|---|---|---|
Medium | COMPLETE | Management Enablement | 281282 | Enhancement | Resolve ResourcePropertyType variables | N/A | Jeff Hamm | Medium | ||
High | Not Started | Management Enablement | 281288 | Enhancement | Decompose operation handler into discreet operations | N/A | Josh Hester | High | Needed | Needed |
Medium | COMPLETE | Management Enablement | 282024 | Enhancement | Need to honor priority attribute for AlternateTypes and ConstraintTypes | N/A | Jeff Hamm | Medium | N/A | N/A |