Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOS 1.1 Iteration5 Features"

(Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc, Ruth))
Line 146: Line 146:
 
<td></td>
 
<td></td>
 
<td></td>
 
<td></td>
 +
</tr>
 +
 +
        <tr>
 +
<td>High</td>
 +
<td> Not started </td>
 +
<td>Management Enablement</td>
 +
<td>[https://bugs.eclipse.org/bugs/show_bug.cgi?id=275731 275731 ]</td>
 +
<td>Normal</td>
 +
<td>Resource handler to check for installed applications</td>
 +
<td></td>
 +
<td>Jeff Hamm</td>
 +
<td>High</td>
 +
<td>N/A</td>
 +
<td>N/A</td>
 
</tr>
 
</tr>
 
<tr>
 
<tr>

Revision as of 16:56, 11 May 2009

COSMOS v1.1 iteration 5 plan

Schedule for Iteration 5

Schedule for Iteration 5

Design doc every enhancement

  • if the enhancement is really small, put in at least a paragraph and a link to the use case for QA and documentation.
  • if the enhancement is not small, the design doc needs to explain the change, anyone other than the assignee who is affected, how much work it is, any ramifications, and in general please avoid any changes to 3rd party materials other than removing a dependency on it. We have no guarantee that the change will be approved for COSMOS v1.1.

Bugzillas for this iteration (Jimmy, David, Jason, Saurabh, QA, Doc, Ruth)

Sizing legend:

  • Low - takes 1-3 days
  • Medium - takes a week
  • High - takes more than a week

Status to be filled in by:

  • Data Collection bugzilla status (Jimmy Mohsin)
  • Data Visualization bugzilla status (Jimmy Mohsin)
  • Resource Modeling bugzilla status (David Whiteman)
  • Management Enablement bugzilla status (Jason Losh)
  • RE/Build bugzilla status (Saurabh Dravid)
  • QA bugzilla status (No owner)
  • Doc bugzilla status (No owner)
  • Legal & release review prep and status (Ruth Lee)

The Status column can have one of these values:

  • COMPLETE
  • On track
  • At risk
  • Not containable
  • Defer (no longer a priority for this iteration)
  • Not started


Priority Status Project or subteam Enhancement Severity Description Blocked by (if applicable) Owner Sizing Design Doc Use Case
P1 All 259011 Normal Prep for the V1.1 release (complete) Ruth Lee N/A N/A N/A
High On track Management Enablement 273067 Enhancement Refactor op/installer as OSGi bundle Ed Blackman High N/A N/A
High On track Management Enablement 274067 Defect Update targetResourceRef attribute in COSMOS SDD Jason Losh High N/A N/A
High On track Management Enablement 275669 Enhancement Connect CLIAdapter to SDD Runtime Orchestrator Jeff Hamm High N/A N/A
High On track Management Enablement 275673 Normal Refactor the advisor bundle to move the CLI Jeff Hamm High N/A N/A
High On track Management Enablement 275670 Enhancement Handler for JRE Josh Hester Medium
High On track Management Enablement 275674 Enhancement Need to resolve translation strings Josh Hester Medium
High Not started Management Enablement 275731 Normal Resource handler to check for installed applications Jeff Hamm High N/A N/A

Use cases

Back to the top