Skip to main content

Notice: this Wiki will be going read only early in 2024 and edits will no longer be possible. Please see: https://gitlab.eclipse.org/eclipsefdn/helpdesk/-/wikis/Wiki-shutdown-plan for the plan.

Jump to: navigation, search

Difference between revisions of "COSMOSF2F-08-Nov-07"

(Logistics)
(Agenda)
 
(86 intermediate revisions by 10 users not shown)
Line 1: Line 1:
 
== Logistics ==
 
== Logistics ==
Compuware Corp
 
One Campus Martius
 
Detroit, MI, USA 48226: Nov 7-9
 
  
Proposed schedule 9AM-5PM daily with a late start at 10AM on Nov 7 and wrapup at 3PM on Nov 9.
+
:Anyone who wants to have a scheduled conference call for a particular time slot, please add a note in that portion of the agenda.  We will use the same number as the weekly Data Collection call.
 +
 
 +
:Toll-free Dial-in number:  +1 (866) 213.1962 
 +
:Primary International Dial-in:  +1.609.454.9912 
 +
:Passcode:  2025533# 
 +
 
 +
:If you need to contact the group at a time when the confrence call is not active, call the main Compuware number (313) 227-7300 and ask for conference room 14W-4216.
 +
 
 +
:Location
 +
::Compuware Corp
 +
::One Campus Martius
 +
::Detroit, MI, USA 48226: Nov 7-9
 +
::Main phone 313 227-7300
 +
::Our meeting room 14W-4216 313.227.7300 x79742
 +
::
 +
::Visitor passes are issued at the Concierge desk near the main entrance.
 +
::Security will direct you to the Visitor Center on the eighth floor of the Woodward wing.
 +
::
 +
::Parking is available in the Compuware ramp.  Take a ticket at the public entrance on Farmer street.  Tickets can be validated at the Visitor Center for free exit from the parking ramp.
 +
:
 +
::Nearest hotel - easy walking distance - two blocks from Compuware
 +
:::Hilton Garden Inn Detroit Downtown
 +
:::351 Gratiot Avenue, Detroit, Michigan, USA 48226
 +
:::Tel: +1-313-967-0900  Fax: +1-313-967-0908
 +
:::[[http://www.hiltongardeninn.com/en/gi/hotels/index.jhtml?ctyhocn=DETDHGI map]]
 +
:
 +
::Nearest airport - DTW (see map for driving directions to Compuware) and locations of HQ and parking ramp.[[http://wiki.eclipse.org/images/5/50/CPWR_DTW_Map.pdf link]]
 +
:
 +
:Proposed schedule 10AM-6PM daily.
 +
::Non-critical items will be scheduled after 3PM Friday for the convenience of those who must leave early.
 +
 
 +
:Anyone who wants to have a scheduled conference call for a particular time slot, please add a note in that portion of the agenda.  We will use the same number as the weekly Data Collection call.
 +
:If you need to contact the group, call the main Compuware number (313) 227-7300 and ask for conference room 14W-4216.
 +
 
 +
 
 +
[[Talk:COSMOSF2F-08-Nov-07|Minutes are on the Talk Page]]
  
 
== Agenda ==
 
== Agenda ==
  
1    Ensure that all the designs for i7 / i8 / i9 are in order
+
1.    Collection of data--northbound interfaces - Wednesday 8:00 AM
*    Ensure that we agree on the delineation between the MDRs and the Broker
+
*    What resources should we target?
*    Ensure that we agree on the exact role of the Management Domain
+
*    How to monitor COSMOS itself?
2   Leveraging CMDBf Use Case
+
**  [[COSMOS internal logging use cases]]
 +
 
 +
 
 +
 
 +
2.   Ensure that all the designs for i7 / i8 / i9 are in order - Wednesday 10:00 AM
 +
*    Ensure that we agree on the delineation between the MDRs and the Broker; and the exact role of the Management Domain.
 +
 
 +
'''Note:''' [[Image:Icon_checkmark.gif]] indicates the item has been discussed
 +
* [[COSMOS_Design_205658]] Extend the initial design and implementation of COSMOS DC Management Domain [[Image:Icon_checkmark.gif]]
 +
* [[COSMOS_Design_204921]] Extend the initial design and implementation of COSMOS DC Broker [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=188390 Support for Nagios agents in data collection [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208100 Create a transformation engine that is able to process CMDBf queries based on a reconciliation taxonomy scheme [[Image:Icon_checkmark.gif#file]]
 +
* [[COSMOS_Design_208274]] Create an MDR toolkit that will allow adopters to easily register and use a data provider inside COSMOS framework [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=205826 Update DataCenter model based on latest SML changes [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=205956 SML validator should provide API for accessing the model [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=205960 SML Data Center repository should be dynamically populated [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=205825 Update SML validator implementation based on changes to the SML latest draft [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208584 Update CMDBf query and registration service implementations to 1.0 spec level [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208976 Data Manager and MDR framework [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208592 Error Handling - improve programming model [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208593 Internationalization Support - programming model [[Image:Icon_checkmark.gif#file]]
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208595 Register Queries with Visualization - programming model
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208603 Register Visualzations with a Query Response - programming model
 +
* https://bugs.eclipse.org/bugs/show_bug.cgi?id=208604 Data Visualization Test Harness
 +
 
 +
 
 +
3.   M2 / Leveraging CMDBf Use Case - Wednesday 1:00 PM
 
*    Reiterate / refine our goals.
 
*    Reiterate / refine our goals.
 
*    How will we push it forward to enable adoption of the CMDBf Use Case?
 
*    How will we push it forward to enable adoption of the CMDBf Use Case?
 
*    Talk about a potential target domain.
 
*    Talk about a potential target domain.
 +
*    What is the UI approach for M2?  Where / how will the COSMOS GUI framework be used?
 
*    Where do we go after this use case?
 
*    Where do we go after this use case?
3   The SQA angle for the COSMOS DC
+
*   Define COSMOS "MDR Toolkit", what tooling we need, etc... see the programming model
*    Talk about our SQA strategy.
+
*    Coordination of efforts with CMDBf.org group
*   Talk about SQA resourcing.
+
**  Schedule call in with Mark J. and Marv W. 3:30pm Eastern 11/8/2007
*    Talk about the exact function of the SQA resources for the COSMOS DC.
+
 
4   The Security Story for the COSMOS DC
+
 
*    Define the scope of Security.
+
4.    COSMOS Programming Model Thursday 8:00 AM
*    How will we publish this key area of interest / concern to the outside world?
+
*    [[COSMOS_Programming_Model_Discussions|discussion page]]
5   Facilitation of Adoption
+
*    What are the use cases for extending/adopting the COSMOS code
 +
*   Adoption patterns
 +
*    What do we need in terms of "SDKs". This will impact how we structure our deliverables
 +
*    [[Provisional API Guidelines]] (we are currently not following these guidelines)
 +
*    Joel's annotation roadmap page [[COSMOSAnnotationsRoadmapPage|here]]
 +
 
 +
5.    Divvy up the work for i8 / i9 (M2) Thursday 12:15 PM
 +
*    Try to assign areas of focus for each company across the COSMOS community for the i8 / i9 ERs
 +
**  Management Domain design & implementation: CA
 +
**  Broker design & implementation: CA
 +
**  Logging design & implementation: CA
 +
**  SQA methodology / manual / automated testing: CA + ?
 +
**  MDR design & implementation: IBM + Compuware + ?
 +
**  GUI design & implementation: IBM + Compuware + ?
 +
**  Cross-company demo enablement: IBM + Compuware + CA ?
 +
*    Review the M2 release plan and establish that it is realistic
 +
*    Define plan / timeframe for synchronizing all COSMOS DC codebases
 +
 
 +
3-2. CMDBf - part 2 Thursday 3:30 PM
 +
*  Schedule call in with Mark J. and Marv W.
 +
 
 +
6.   Facilitation of Adoption Thursday 4:00 PM
 
*    How do we publish our packaging for the CMDBf Use Case?
 
*    How do we publish our packaging for the CMDBf Use Case?
*    Identify the tech stack for the CMDBf Use Case.
+
*    Identify and publish the tech stack for the CMDBf Use Case.
 
*    Identify the range of adopters for the Leveraging CMDBf use case.
 
*    Identify the range of adopters for the Leveraging CMDBf use case.
 +
*    Documentation
 +
*    Useability
 +
*    Support
 
*    What can we do to ensure that adopters of ALL types derive immediate value?
 
*    What can we do to ensure that adopters of ALL types derive immediate value?
6   Eclipse con presentations/demos
+
 
 +
7.   Security considerations for the COSMOS DC M2 Friday 8:00 AM
 +
*    Define the scope of Security
 +
*    What is our Security model?
 +
*    How will we publish this capability & area of concern to the outside world?
 +
 
 +
8.    Fire drill Friday 10:00 AM
 +
 
 +
4-2.  Programming model part 2 Friday 10:30 AM
 +
*    Close on what to do with the sandbox
 +
*    Provisional APIs
 +
 
 +
9.    Breakout sessions Friday 11:00 AM
 +
 
 +
10.  SQA considerations for the COSMOS DC M2 Friday 12:00 Noon
 +
*    Define the SQA strategy for M2
 +
*    Talk about SQA resourcing
 +
*    Talk about the exact function of the SQA resources for the COSMOS DC
 +
*    Define QA metrics & release closure criteria for i8 / i9 (i.e. M2)
 +
 
 +
11.  Review Plan and Action items 1:00 PM
 +
 
 +
[http://wiki.eclipse.org/Cosmos1.0Features#COSMOS_1.0_Features * i8/i9 Enhancements]
 +
 
 +
12.  EOM 2:30 PM
 +
 
 +
 
 +
----
 +
[[Category:COSMOS Summits]]

Latest revision as of 09:37, 28 January 2008

Logistics

Anyone who wants to have a scheduled conference call for a particular time slot, please add a note in that portion of the agenda. We will use the same number as the weekly Data Collection call.
Toll-free Dial-in number: +1 (866) 213.1962
Primary International Dial-in: +1.609.454.9912
Passcode: 2025533#
If you need to contact the group at a time when the confrence call is not active, call the main Compuware number (313) 227-7300 and ask for conference room 14W-4216.
Location
Compuware Corp
One Campus Martius
Detroit, MI, USA 48226: Nov 7-9
Main phone 313 227-7300
Our meeting room 14W-4216 313.227.7300 x79742
Visitor passes are issued at the Concierge desk near the main entrance.
Security will direct you to the Visitor Center on the eighth floor of the Woodward wing.
Parking is available in the Compuware ramp. Take a ticket at the public entrance on Farmer street. Tickets can be validated at the Visitor Center for free exit from the parking ramp.
Nearest hotel - easy walking distance - two blocks from Compuware
Hilton Garden Inn Detroit Downtown
351 Gratiot Avenue, Detroit, Michigan, USA 48226
Tel: +1-313-967-0900 Fax: +1-313-967-0908
[map]
Nearest airport - DTW (see map for driving directions to Compuware) and locations of HQ and parking ramp.[link]
Proposed schedule 10AM-6PM daily.
Non-critical items will be scheduled after 3PM Friday for the convenience of those who must leave early.
Anyone who wants to have a scheduled conference call for a particular time slot, please add a note in that portion of the agenda. We will use the same number as the weekly Data Collection call.
If you need to contact the group, call the main Compuware number (313) 227-7300 and ask for conference room 14W-4216.


Minutes are on the Talk Page

Agenda

1. Collection of data--northbound interfaces - Wednesday 8:00 AM


2. Ensure that all the designs for i7 / i8 / i9 are in order - Wednesday 10:00 AM

  • Ensure that we agree on the delineation between the MDRs and the Broker; and the exact role of the Management Domain.

Note: Icon checkmark.gif indicates the item has been discussed


3. M2 / Leveraging CMDBf Use Case - Wednesday 1:00 PM

  • Reiterate / refine our goals.
  • How will we push it forward to enable adoption of the CMDBf Use Case?
  • Talk about a potential target domain.
  • What is the UI approach for M2? Where / how will the COSMOS GUI framework be used?
  • Where do we go after this use case?
  • Define COSMOS "MDR Toolkit", what tooling we need, etc... see the programming model
  • Coordination of efforts with CMDBf.org group
    • Schedule call in with Mark J. and Marv W. 3:30pm Eastern 11/8/2007


4. COSMOS Programming Model Thursday 8:00 AM

  • discussion page
  • What are the use cases for extending/adopting the COSMOS code
  • Adoption patterns
  • What do we need in terms of "SDKs". This will impact how we structure our deliverables
  • Provisional API Guidelines (we are currently not following these guidelines)
  • Joel's annotation roadmap page here

5. Divvy up the work for i8 / i9 (M2) Thursday 12:15 PM

  • Try to assign areas of focus for each company across the COSMOS community for the i8 / i9 ERs
    • Management Domain design & implementation: CA
    • Broker design & implementation: CA
    • Logging design & implementation: CA
    • SQA methodology / manual / automated testing: CA + ?
    • MDR design & implementation: IBM + Compuware + ?
    • GUI design & implementation: IBM + Compuware + ?
    • Cross-company demo enablement: IBM + Compuware + CA ?
  • Review the M2 release plan and establish that it is realistic
  • Define plan / timeframe for synchronizing all COSMOS DC codebases

3-2. CMDBf - part 2 Thursday 3:30 PM

  • Schedule call in with Mark J. and Marv W.

6. Facilitation of Adoption Thursday 4:00 PM

  • How do we publish our packaging for the CMDBf Use Case?
  • Identify and publish the tech stack for the CMDBf Use Case.
  • Identify the range of adopters for the Leveraging CMDBf use case.
  • Documentation
  • Useability
  • Support
  • What can we do to ensure that adopters of ALL types derive immediate value?

7. Security considerations for the COSMOS DC M2 Friday 8:00 AM

  • Define the scope of Security
  • What is our Security model?
  • How will we publish this capability & area of concern to the outside world?

8. Fire drill Friday 10:00 AM

4-2. Programming model part 2 Friday 10:30 AM

  • Close on what to do with the sandbox
  • Provisional APIs

9. Breakout sessions Friday 11:00 AM

10. SQA considerations for the COSMOS DC M2 Friday 12:00 Noon

  • Define the SQA strategy for M2
  • Talk about SQA resourcing
  • Talk about the exact function of the SQA resources for the COSMOS DC
  • Define QA metrics & release closure criteria for i8 / i9 (i.e. M2)

11. Review Plan and Action items 1:00 PM

* i8/i9 Enhancements

12. EOM 2:30 PM



Back to the top